Laserfiche WebLink
%~~ . • • <br />/ Colorado, in this informal submittal, has proposed co add <br />additional language a[ kale 4.04.} that rill make the variance <br />alternative design for general fill regnireme__^.ts at Rule 4.04.: <br />also applicable to the specific head-of-hollov fill regulatiot_ <br />found at kale 4.09.3. Colorado indicated in the Statement o: <br />and Purpose section of this informal amendment that tae var:a^~ <br />Rule 9.D9.1(3) already applies to head-of-hollov fills, and tn. <br />proposed lanquaae at Rule 4.09.3 is simply to clarify this. 5- <br />the above discussion under H-A. <br />To be no less effective than the Federal regulations, Colorado <br />not apply the general fill variance found at kale 4.09.1(3) tc <br />' ~ head-of-hollov fill provisions at Rule 4.09.3. <br />H-C Rule 4.09.4(1); 30 CFR 816.73/817.73 (Durable Rock Fills) <br />Colorado submitted formally a nev Rule 4.09.4 in CO-384. See <br />OSMAE issue letter dated February 7, 1989 for disposition of :. <br />E-C and &-4. (Note: In Eaclosure A of the February 7, 1989 :_ <br />le*_ter 052SRE failed to acimovledge that E-C vas also partially <br />addressed in CO-3B9.) <br />Colorado, in this informal submittal, has proposed additional <br />lanouaae at Ruie 4.09.4(1) that will make the variance for <br />alternative design specifications found in the general fill <br />requirements at kale 4.D9.1(3) also applicable to the durable <br />• fill regulations proposed at 4.09.4. <br />As discussed in the finding for "excess spoil - valley fills," <br />number E-A, there are several scenarios that could render this <br />to be less effective than tae Federal regulation. Incorporat_- <br />the "alternative specification" into the durable roc's fills vc_ <br />(1) alloy nondarahie material to comprise more than 20 percent <br />the fill volume, (2) not meet the requirements of design safe=: <br />factors of 1.5 for end of construction and 1.1 for earthanaice <br />condition, (3) not require as internal 6rainaae system vhen pi. <br />as a head-of-hollov fill, and (4) not require the coastructio= <br />diversions to safely pass runoff from areas adiacent to and ac- <br />the fill and runoff from the surface of the fill from a 100-ve- <br />24-hour storm event. <br />It should be noted, Colorado's approved program alloys an <br />alternative method to construct durable rock fills. This <br />alternative alloys placement of material by dumping in a single <br />lift, provided that the method is certified by a qualified <br />registered professional engineer. <br />To be no less effective than the Federal reaulatioas, Coioradc <br />not apply the "alternative specification" provision of the gene <br />provisions at Ruie S.D9.1(3) to the durable rock fill provisic~ <br />Rule 4.04.4. <br />5 <br />