Laserfiche WebLink
Ia~summary, our interpretation is that the specific requirements far valley <br />• and head-of-hollow fills (Rule 4.09.2 and 4.09.3) take precedence over the <br />general requirements where conflicts occur. In addition, Rule 4.09.$ <br />(durable rock fills) allows for the construction of valley and head-of-hollow <br />fills using alternative methods on a site specific basis provided the <br />requirements of 4.09.4 are met. Should you have any questions or require <br />additional information please contact Mel Granberg of WI staff at (303) <br />844-3233 or FTS 564-3233. <br />Attachment <br />• <br />• <br />