My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-01-04_REVISION - M1986076
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986076
>
2004-01-04_REVISION - M1986076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:42:23 PM
Creation date
11/21/2007 10:01:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986076
IBM Index Class Name
Revision
Doc Date
1/4/2004
Doc Name
Cost Summary Form
From
DMG
To
DGMC
Type & Sequence
AM3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task a : 09b <br />Date: O7/05r1004 <br />User: RCO <br />CIRCES Cost Estimating Software <br />WHEEL LOADER -LOAD AND CARRY WORK <br />State:Colorado Permiuobn:M-1986-076 <br />County as Plata Abbreviation :none <br />Site :Incas Mine Filename : M076-09b <br />Agency or organization name : DMG <br />Permit or otherjob action :Amendment AM-03 <br />Task descript)on : Aep/ace topsoil over graded contour depression fill area, first phase <br />HOURLY EQUIPMENT COST Basic machine : CAT938G Horsepower: 160 <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Data source: (CRGJ <br /> Utilization % <br />Cost Breakdown : Ownership cosVhour : $74.83 NA <br />Operating cosVhour : $18.35 700 . <br />Operator cesVhour : $30.65 NA <br />Total unit cosUhour : $63.83 Total fleet cosUhour: $127,66 <br />MATERIAL QUANTITIES <br />Initial Swell Final <br />volume: 242 LCY factor : NA volume: 242 LCV <br />Source of quantity take-0ff :6" depth x 0.3 acre <br />Source of estimated swell factor: na <br />HOURLY PRODUCTION (Cat HB) <br />Loader Cycle Time Unadjusted basic cycle time (load. dump, maneuver) : 0.475 minutes <br />Cycle Time Factors Factor (min.) Source <br />Material : Material3r4" fo 6' diameter 0.000 (Cat HB) <br />Stockpile: Conveyor or dozerpiled l0 h. high or less 0.070 (Cat HB) <br />Truck ownership : No adjustment -factor not applicable 0.000 (Cat HBJ <br />Operation : Constant operetion -0.040 (Cat HBj <br />Dumptarget: NO adjustment-factor not applicable 0.000 (Cat HB) <br />Net cycle time adjustment : -0.030 minutes <br />Adjusted basic cycle time: 0.445 minutes <br />Rollins Resistance -Road Conditions <br />Haul : SOtt, rutted dirt, no maintenance or water, 4'tire penetration <br />Return :Soh, rutted dirt, no maintenance or water, 4' Lire penetration <br />Haul antl Return Time Length Grade res. Rolling res. Total res. Travel time Data <br /> (feet) (%) (%) (%) (minutes) Source <br />Haul route : 175 0.00 8.00 8.00 0.2265 (Cat HB) <br />Return route : 175 0.00 8.00 8.00 0.2051 (Cat HB) <br /> Total travel time : 0.4316 minutes <br />Loatler Bucket Caoacity Total cycle time : 0.877 minutes <br />Ratetl capacity: 3.25 LCY (heaped) (Cat HB) <br />Bucket fill factor. 0.875 Blasted rock-well blasted (80-95%) <br />Adjusted capacity: 2.84 LGY <br /> Source <br />Job Contlition Correction Factors Altitude adjustment factor: 1.00 (Cat HB) <br />Site altitude: 10,800 feet Job efficiency factor. 0.83 (l shilf/day) <br /> Net correction: 0.83 multiplier <br />Unadjusted hourly unit production: 194.64 LCYMr <br />Adjustetl hourly unit production: 161.56 LCVMr <br />Adjustetl hourly fleet production: 323.11 LCVMr <br />JOB TIME AND COST <br />Fleet size: 2 Loatler(s) <br />Unit cost: $0.395 /LCY <br />(Cat HB) <br />Total job time: O.7$ Hours <br />Total job cost : $98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.