My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-01-04_REVISION - M1986076
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986076
>
2004-01-04_REVISION - M1986076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:42:23 PM
Creation date
11/21/2007 10:01:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986076
IBM Index Class Name
Revision
Doc Date
1/4/2004
Doc Name
Cost Summary Form
From
DMG
To
DGMC
Type & Sequence
AM3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />WHEEL LOADER -LOAD AND CARRY WORK <br />Task n : 09a State :Colorado Permitfjob q : M-1986-076 <br />Date: 01/05/2004 County:La Plata Abbreviation:none <br />User: RCO Site:lncas Mine Filename:M076-09a <br />Agency or organization name : DMG <br />Permit or other job action :Amendment AM-03 <br />rack description :Replace topsoil over graded open pit area, first phase <br />Il1RLV EQUIPMENT COST Basic machine: CAT938G Horsepower: 160 <br />Attachment no. t : ROPS Cab Shift basis : 1 per day <br /> Data source : (CRG) <br /> utilization % <br />Cost Breaktlown: Ownership cosVhour : $14.83 NA <br />Operating cosVhoun $18.35 100 <br />Operator cosVhour . $30.65 NA <br />Total unit cosVhour : $63.83 Total flee[ cosUhour: $127.66 <br />MATERIAL OUANTRIES <br />Initial Swell Final <br />volume: 807 LCY factor: NA volume: 807 LCY <br />Source of quantity take-off : 6' depth x 1 acre <br />Source of estimated swell factor: na <br />HOURLY PRODUCTION (Cat HB) <br />Loader CVCIe Time Unadjusted basic cycle time (load, dump, maneuver) : 0.475 minutes <br />Cycle Time Factors Factor (min.) Source <br />Material : Matedal3r4'to 6' diameter 0.000 (Cat HB) <br />Stockpile : Conveyor or dozer piled 10 h. high or less 0.010 (Cat HB) <br />Truck ownership : No adjustment - /actornof applicable 0.000 (Cat HB) <br />Operation : Constant operation -0.040 (Cat He) <br />Dumptarget: NO adjustment-rector nor applicable 0.000 (Cat HB) <br />Ne[ CyCIe Ilme atlJlls[ment <br />Adjusted basic cycle time <br />0.445 <br />minutes <br />minutes <br />Rollino Resistance -Road Conditions <br />Haul : SOR, rafted dirt, no maintenance or water 4'tire penetration <br />Return : SOR, rutted dirt, no maintenance or wafer, 4'tire penet2tion <br />Haul antl Retum Time Length <br />(feet) Gratle res. <br />(%) Rolling res. <br />(%) Total res. <br />(%) Travel time <br />(minutes) Data <br />Source <br />Haul route : 175 0.00 8.00 8.00 0.2265 (Cat HB) <br />Return route : 175 0.00 8.00 8.00 0.2051 (Cat HB) <br />Total travel time : 0.4316 minutes <br />Loader Bucket Caoaciw Total cycle time : 0.877 minutes <br />Rated capacity: 3.25 LCY (heaped) (Cat HB) <br />Bucket fill factor : 0.875 Blastedrock -well blasted (80 - 95%) <br />Adjusted capacity: 2.84 LCY <br />Job Condition Correction Factors <br />Site altitude: 10,800 feet <br />Unadjusted hourly unit production : 194.64 LCYMr <br />Atljustetl hourly unit production : 161.55 LCY/Hr <br />Adlustetl hourly fleet production: 323.11 LCY/Hr <br />JOB TIME AND COST <br />Fleet size : 2 Loader(s) <br />Unit cost: $0.395 /LCY <br />Source <br />Altitutle adjustment factor: 1.00 (Cat HB) <br />Job efficienq factor: 0.83 (15hiiVday) <br />Net correction : 0.83 multiplier <br />(Cat HB) <br />Total job time: 2.50 Hours <br />Total job cost : $319 <br />
The URL can be used to link to this page
Your browser does not support the video tag.