My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV09246
DRMS
>
Back File Migration
>
Revision
>
REV09246
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:09:46 AM
Creation date
11/21/2007 10:01:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979089
IBM Index Class Name
Revision
Doc Date
12/15/1997
Doc Name
CONSTRUCTION MATERIALS REGULAR OPERATION RECLAMATION PEMRIT APPLICATION FORM
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' EXHIBIT D <br />MINWG PLAN <br />' Z3 ROAD PIT <br />AMENDMENT #2 <br />PERMfT # M-79-089 <br />The purpose of this Amendment is to add 19.7 acres to the existing Permit. The azea to be added <br />' is located in the West'/ of the Northwest 1/4 of the Southwest 1/4 of Section 5, Township I <br />South„ Range 1 West of the Ute Meridian. See Exhibit C-l. <br />t The total area to be mined contains 14.2 acres. A 200 foot mining setback will be maintained along <br />the north property line for use as a stockpile site for topsoil, overburden and processed grave] <br />products. A 60 foot mining setback will be maintained from the center of 23 Road and a 30 foot <br />t ntirting setba[;k along the east property line. See Exhibit C. The azea will be mined iu two or three <br />Phases starting nn the north and proceeding to the south. The topsoil and overburden from Phase I <br />azea will be stripped and stockpiled on the north side of the pit area. After the sand and gravel has <br />' been removed from Phase I azea, the stockpiled overburden will be used to backlill the previsouly <br />mined from north to south to its present elevation.The crusher and processed gravel stockpiles for <br />Phase I mining azea will be located on the south side of pit in the Phase III area. Overburden from <br />' Phase II and -I will be used to complete the backfilling of Phase I azea. The mitring of Phase III <br />will connect into the existing pond located on the south side of the property. Crushing for Phase III <br />will take place in the bottom of the pit with the processed material being stockpiled on the north <br />' stockpile area and the backfilled portion of Phase I. <br />The overburden on the site averages twelve feet in depth. The depth of the sand aztd gravel deposit <br />t is approximately ten feet with the underlying material being Mancos Shale. <br />Mining will be done using tiont end loaders, hydraulic excavators, dozers and trucks. <br />Muting will start in the spring of 1998 after all permits have been obtained "Che time required to <br />' mine, crush and stockpile each Phase will be two to three months. A Phase will produce enough <br />material to ias[ one to two years. The life of the pit will be three to six years. <br />' The primary product to he mined is sand and gravel. This material will be used for construction <br />aggregate for roads, pipe bedding and concrete. <br /> <br /> <br /> <br />1 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.