Laserfiche WebLink
sheet 7 of 2 <br />CIRCES Cost Estimatinst Software <br />Task # <br />Date <br />User: <br />Agency or organization name :DMG <br />005 State :Colorado <br />11/21/2005 Counly :Weld <br />ESC Site :Herman Feit Pit <br />Permit or other job action :Reevaluation Of Bond <br />Task description :Grade Topsoil <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Scraper work team -Scraper :Cat 615C Series 2 <br />-Push dozer:NA <br />Supportequipment -Load area : NA <br />-Dump area :Cat D8R Series 11 - 8SU <br />Cost BrE <br />Road maintenance -Motor grader : NA <br />-W ater truck :Water Tanker, 5,000 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scrape/2 NA NA dozer NA mischuk <br />Utiliza8on-machine : 100 NA NA 100 NA 20 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cosUhour : $32.68 NA NA $47.61 NA $23.89 <br />Operating cosUhour : $73.67 NA NA $75.75 NA $8.52 <br />Ripper op. cosUhour : NA NA NA $0.00 NA NA <br />Operator cosUhour : $32.72 NA NA $32.53 NA $33.68 <br />Unit subtotals : $139.06 NA NA $155.90 NA $66.09 <br />Number of units : 2 0 0 1 0 1 <br />Group subtotals : Work : $278.12 Support : $155.90 Maintenance : $66.09 <br />Total work team cosUhour : x500.11 <br />.....v s ~rwy„~~.. <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 15.000 CCY factor : 1.115 volume : 16.725 LCY <br />Source of quantity take-off :DMG Estimate <br />Source of estimated swell factor :Cat Handbook <br />Pennitrob # : M-1977-522 <br />Abbreviafion :none <br />Filename : M522-005 <br />