Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 004 <br />Date : 11/21/2005 <br />User : ESC <br />State :Colorado <br />County :Weld <br />Site :Herman FeK Pit <br />Agency or organization name :DMG <br />Permit or other job action :Reevaluation of Bond <br />Task description :Grade South Hig <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series 11 - 8SU Horsepower : 310 <br />_,~. ~_ Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 par day <br />Attachment no. 2 :3-shank dpper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $53.92 NA <br />Operating cosUhour : $75.75 100 <br />Ripper op. cosUhour : $2.42 30 <br />Operator cosUhour: $32.53 NA <br />Total unit cosUhour : $164.64 Total fleet costfhour : 5329.2T <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 16,700 BCY factor : 1.250 volume : 20,875 LCY <br /> <br />Source of estimated volume :DMG Estimate <br />Source of estimated swell factor :Cat Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source' <br />Average push distance : 200 feet <br />Unadjusted howdy production : 491.9 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 0.00 % (1 <br />Average site altitude : 4,900 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth - Drv packed <br />JOB TIME AND COST <br />Fleet size : 2 Dozers) <br />Unit cost : $0.828 /LCY <br />PermiUjob# :M-1977-522 <br />Abbreviation :none <br />Filename : M522-004 <br />Operator skill : 0.75 (a~ <br />Material consistency : 0.90 (Cat <br />Dozing method : 1.00 (ge <br />Visibility : 1.00 (au <br />Job efficiency : 0.83 (1 shit <br />Spoil pile : 0.80 ((nc <br />Push gradient : 1.00 (Cat <br />Altitude : 1.00 (Cat <br />Matedal weight : 0.90 (Cat <br />Blade type : 1.00 (S/S <br />Net correctlon : 0.40 <br />HB) <br />Adjusted unit production : 198.78 LCY/hr <br />Adjusted fleet production : 397.57 LCY/hr <br />Total job time : 52.51 Hours <br />Total job cost : 517,289 <br />