<br />I EXHIBIT D <br />Mining Plan <br />The operator proposes to quarry granitic gneiss through drilling <br />and blasting on 40-foot benches. ~ <br />A series of seven benches is proposed. Mining of each bench <br />will be conducted in two 40-foot increments. Initially, the rock <br />will be drilled to a depth of 40 feet, blasted, and loosened materials <br />will be trucked to an on-site production plant for processing. Sub- <br />sequently, drilling will be repeated along the same vertical plane <br />for an additional 40 feet and the rock will again be blasted and re- <br />moved. The resulting benches will be 40 feet wide and backed by a <br />sub-vertical 80-foot highwall. J <br />Mining will commence in the southern portion of the site and will <br />proceed in a counterclockwise manner toward the center of the quarry. <br />I <br />Typical equipment used in the quarry will include the following: <br />• 2 Haulers, 35 - 50 ton Eucs <br />• 1 Front end loader, 10 cy <br />• 1 6" Drill, CP650 DTH <br />The processing plant consists of feeders, be]t conveyors, vibrating <br />screens, classifying equipment, crushers and power units, all arranged <br />on steel support structures. A Johnson March Dust Suppression System <br />and two Baghouse Collection Systems are incorpo AITf~-N M~TIT -1. <br />as well . ~X1`oFAw~ov~p MITtE?LAN <br />C~•v~AM>=Nr~ME?3T~ I (~qiq~ <br />Mobile support equipment for the plant con. C Nrn~E BRP•UGETS~ <br />• 1 Front end loader, 5 cy <br />• 1 D-155 Komatsu <br />I <br />D-1 <br />~~ <br />