My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE21652
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE21652
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:31:41 PM
Creation date
11/21/2007 10:00:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973021
IBM Index Class Name
Enforcement
Doc Date
7/20/1993
Doc Name
MORRISON QUARRY PN M-73-021 REQUEST FOR AMENDMENT
From
ECC CONSTRUCTION MATERIALS AMERICA INC
To
DMG
Violation No.
MV1993023
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
07/20/'1993 20:10 <br /> <br />303-980-0~ <br />BITUMINOUS ROADWAYS <br />f an approximate elevation of 6975 feet. Near-horizontal 40-foot wide <br />~ \} benches will lie between each 80-foot escarpment. <br />Gradin <br />A mixture of salvaged topsoil, quarry fines and organic matter <br />will be used to restore a growth medium to the site. This material <br />will be spread over the area to be reclaimed and graded as Shown in <br />Exhibit F. Movement of machinery across the s]ope will compact the <br />PAGE 10 <br />soil. The compacted materials will enhance the stability of the adaa- <br />cent highwalls. <br />Topsoiling <br />The mixture of topsoil, quarry fines and organic matter will be <br />tested by a qualified soil laboratory and appropriate amendments will <br />be made in order to ensure that an adequate medium is provided. The <br />fertilized medium will be distributed on the site to a minimum depth <br />of 12 inches. <br />A mulch will be applied in order to retain available moisture. <br />In finish grading, creation of a rough surface that is somewhat coarse <br />and variable will further aid in moisture retention. Irrigation prior <br />to seeding will bring the soil to its maximum water-holding capacity <br />and enhance the success of the revegetation program. <br />Reve9etation <br />Revegetation of the site will commence once the growth medium <br />has been tested and fertilized as necessary. Slopes will be seeded <br />by incorporating the seed into a hydro-mulch application. The seed <br />mixture recommended for the site i5 a5 follows: <br />E-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.