My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-08-16_REVISION - M1977301
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977301
>
2004-08-16_REVISION - M1977301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:21:15 PM
Creation date
11/21/2007 10:00:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977301
IBM Index Class Name
Revision
Doc Date
8/16/2004
Doc Name
Technical Revision
From
Pete Lien and Sons Inc
To
DMG
Type & Sequence
TR4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINING PLAN <br />Phase I Area 8 and 9 will be stripped, and Areas 8, 9, 10 and part of 11 will be mined (mostly <br />that part of Area 11 which was already stripped prior to 1977). The topsoil from the <br />lower area will be removed first and stockpiled in Area A (Marked TS on some maps). <br />The topsoil will be preserved and vegetated with annual rye and Indian ricegrass. The <br />sandstone over- burden will be drilled and shot. It will then be stripped and piled in front <br />of Area A. Limestone will be removed from areas 8, 9 and 10 and W 1/4 of area 11. This <br />phase was expected to require 2 years but has lasted from 1977 to 1998 and is now <br />expected to Last for another year. The total area worked will be approximately 43 acres. <br />Phase 1[ Areas 4 and 5 will be stripped and mined. The topsoil will be removed, stockpiled, <br />preserved and vegetated in area A or used immediately in reclamation. The sandstone and <br />overburden material will be stripped and piled in front of A, or placed in area D, or <br />placed in areas which have been mined out as backfill to facilitate concuttent <br />reclamation. At present market conditions, this phase will last for 5 years. The area <br />worked at this time will be approximately 16 acres. <br />Phase III Areas 1, 2 and 3 will be stripped and mined. The topsoil will be removed, stockpiled, <br />preserved and vegetated in area A or used immediately in areas that are being reclaimed.. <br />The sandstone and overburden material will be stripped and piled in front of A, or placed <br />in area D, or used immediately as backfill for reclamation. This phase is expected to last <br />approximately 5 years at current market conditions. The area worked at this time will be <br />approximately 15 acres. Concurrent reclamation will continue during this phase. The <br />sandstone overburden will be backfilled into the excavation left by extraction of the <br />limestone, leveled and contoured. The topsoil from area A will be spread over the <br />EXHIBIT D. (REV) MINE PLAN, ROBERTS QUARRY Aug. 2004, PAGE 2 OF 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.