Laserfiche WebLink
<br />r~ <br />TRAPPER MINE RESPONSE TO PR-1 ADEQUACY RESPONSE DOCUMENT <br />May, 1987 <br />4. Surface Water and Sediment Control <br />All ponds proposed for use in the sediment control plan should be resur- <br />veyed to determine capacity and inspected for structural integrity of the <br />embanlanent and spillway structures. Coyote Dam should also be resurveyed <br />to determine the existing capacity. <br />Response <br />Trapper does not understand the regulatory justification of this as a <br />condition of permit approval. As we understand the permit review process <br />for structures, the Division is assessing the ability of proposed plans <br />to meet regulatory imposed design criteria. Once those designs are <br />approved, it is the responsibility of the operator to meet those approved <br />criteria and to provide the Division proof that those criteria have been <br />met. To impose meeting some criteria prior to permit approval is beyond <br />the jurisdiction of the Division's regulations in our opinion. <br />