Laserfiche WebLink
• • <br />r <br />~ <br /> Ti:^.e <br />ab <br />e <br /> Fec3amation will be continuous throughout ~ e min?ng <br /> operation. As shoreline is created (eastern edge =irs i~ and the <br /> mir.ir.g progresses westward, <br />~ the tnpscil will be repl ced along <br /> *_he <br />bar.l.s ar.d seeded as soon as przctical. The f rst year, <br /> approximately 200 lineal f eet of shoreline will be c. eat=d and <br /> approximately 1000 feet per year (500 Werth and 5 O' south) <br /> until the fifth year when about X200 feet will be a pcsed a.^.d <br /> reclaimed. <br /> Final grading will be a <br />to 10 fee* <br />below waterline ~h:iv slope frem the undis urbed area <br /> _ <br />. <br /> Seeding, fertilize.tion. ravegetatien and topso:lin have been <br /> previously discussed in this section. <br /> <br /> <br /> <br />r <br />r <br />t .- <br />~-4 <br />