My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE21608
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE21608
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:31:39 PM
Creation date
11/21/2007 10:00:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984036
IBM Index Class Name
Enforcement
Doc Name
M-84-036 DAKOLIOS PIT 1 PRESENTATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i ~ T r. <br />s 7 2 iV S !VG r^L.4iV <br />The miring cperatior. will be dry. The excavatio will be <br />pumped dry after reac`:ing the water table. <br />Mining will proceed from the eastern edge of tha p epert•~ .and <br />move tcward *_he we=_t. Tapsoi: a:ill be stripped 6y s rapers or <br />front end leaders and stockpiled en locations shcwn cn t~^.e miring <br />plan .nap. Aggregate tc be mired wili be removed by dragline <br />ar.d deposited in the area of the processing plant er r. ar the end <br />cf the cor.ve~~or which will trar.spcrt the material t^ the plant <br />site. As mining progre=_ses ::e=_tward. the plant wil be mevad <br />aiiezd of the mining araa. <br />Earthmcving wiil be conducted in three phases. F'~ase I will <br /> he the removal and stockpiling o= topsoil ar,d overburd n. Phase <br /> Ii will be the removal of the aggregate material ~v dracline. <br /> Phase IiT_ will be the replacement ^f overburden. an ' topsoil. <br /> Phases I ar.d II will be conducted by scrapers, =rent nd '_oaders <br /> or dragiir.e. <br /> There is no water di•iersier. expected. a crainace itch which <br /> runs through the prcperty from south to r.crth will 6e llcw=d to <br /> continue to drain into the excavated positicn of he mining <br /> operation a nd then out of the e;<cavatior. back ir.ta ~ is normal <br /> drainage i= flew is sufficient enough to raise the wat r love: to <br /> the assigned discharge level. <br /> <br /> <br />The ma::imum area tc be mined du-ing .s cne near perE~d will be <br />11.5 acre=_. The plant =_ite will re•~uire appr_:;ima.te~y .-~ 'acres. <br />The access ,cad :-:i 11 be no mere than. _SGtI feet l or.g a .d ?e ==et <br />wi l i be -cr a ma;; i mug^. area ^s 1 . ~ acres. Tne area o' =`:e road <br />dist;:rbance will recu.e as the mining moves westward. <br />T;~e timetat:ie o~ mining :-gill te.ke place in five =_t~gea as <br />shown, cn the mining map. Each stage is e~•?ected _~ a s'_nisi-e," <br />during one year cf ~peraticn. A strap_ppro;;imately n' Y i?~?i>' <br />wii: be mined each mcnth. Each stage wail be mined r om East to <br />Test. <br />!J•.:erburden_nd t~psoii varies .rem D.5' cc ? with 'n avsrace <br />dep_h c= a=cut _.~ h'a:;i:nun meat ~ ~~ tha heft cr tr-e <br />agg-e•;ate ma.teri =.1 i=_ _~ <br />The azrat~;m i:nmed_atel;• beneatn =ina m=teriai `_c b <br />_ne F_erre chase. <br />m ~~~. <br />'p~~~~ 7-1 <br />'f/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.