Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />D. Operation Plan <br />1. The revised operation plan is found on page 98. <br />E. Reclamation <br />1. Page 108 has been modified to indicate the sources of fill material. <br />2. The portal seal design is shown on Plate 16 and described on <br />Page 108. <br />3. A topographic map, Exhibit F-2, shows the final configuration <br />of the mine bench area. <br />4. The plan to extinguish hot spots in the mine bench is discussed <br />on page lOBiof the Reclamation Plan. <br />F. Exhibits <br />1. The exhibits were changed to reflect valid certification, legends, <br />scales and the correct permit boundary specifically Exhibits, <br />A, B, C, D, E, F, F-2, G, K, L, M, N, T, V, W, X, and Y. <br />Part II - CMLRD Comments <br />The species diversity criteria and revegetation methods for the purpose <br />of determining reclamation success were changed. The changes reflect the CMLRD <br />Part II Advisory Comment regarding revegetation success criteria for species diversity. <br />Pages 111 - 113(a) were modified and page 113 i (b)(c) was omitted. <br />Part III - Status of Stipulations <br />Stipulations are either resolved or on-going, no action required. <br />B <br />