My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV09026
DRMS
>
Back File Migration
>
Revision
>
REV09026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:09:32 AM
Creation date
11/21/2007 9:58:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
8/26/1994
Doc Name
MR 134 STIPULATION 53 FROM TR 69 WEST ELK MINE PN C-80-007
From
DMG
To
MTN COAL CO
Type & Sequence
MR134
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Minor Revision No. 134 <br />August 26, 1994 <br />Page 3 <br />J. The Division concurs with the recommendations of <br />Greystone for the best management practices to be <br />utilized for the fan area. <br />The following items address the substation small area <br />exemption: <br />A. The SAE demonstration shows that sediment control <br />features will not be required during the life of <br />the facility as the area will consist of a concrete <br />pad. However, how will be sediment be minimized <br />during construction as this area will be bare <br />ground? These measures should be installed and <br />maintained until construction is complete and there <br />is little potential for sediment to be transported <br />off site. MCC should specify the interim measures <br />to be utilized and where they will be placed. <br />B. The SAE section of the permit, page 2.05-37, should <br />be updated with the new SAE demonstration or refer <br />to Exhibit 66. <br />3. Revised Map 53A will be incorporated into the permit. <br />4. All of the best management practices shown on Enclosure <br />2 and 3 of Greystone's small area demonstration have not <br />been included on Map 54A. They are as follows: ground <br />cover filter for the topsoil stockpile and the riprap <br />ditches for the staging area. Map 54A should be revised <br />to include these structures. <br />5. Revised drawings LPG-103F and 104F will be included in <br />Exhibit 42A. <br />6. The revised project description and the design drawings <br />will be included in Exhibit 42A. In addition, the <br />Division recommends that the letter from Envirocon, dated <br />August 9, 1994, the reclamation drawing, and the noise <br />level survey be included in the Exhibit. Please verify. <br />7. Revised page 2.05-45 will be incorporated into the <br />permit. <br />8. Page 2.05-22 still includes the "PR 05" footnote. In <br />addition, pages 2.04-15, 16, and 18 and 2.05-22 cannot be <br />inserted into the permit as revised because preceding <br />and/or succeeding pages do not match up. Please provide <br />revised pages. <br />
The URL can be used to link to this page
Your browser does not support the video tag.