Laserfiche WebLink
Table 27 <br />Hydrology Monitoring Requirements -New Elk Mine' <br />Water Level Field Short NPDES Organic <br />Site or Flow Measurement* List* List List* <br />PRS-1 S (Q) S (Q) A .. <br />PRS-0 (aka NE 080j S (Q) S (Q) A . <br />MW-1 Q Q <br />MW-2 Q A <br />MW-3 Q ~( /~K~l <br />~ Q <br />I <br />~ <br />MW-4 % I /J ~ ~ <br />l t <br />MW-5 Q <br />MW-6 Q A <br />MW-7 Q Q <br />MW-8 Q A <br />MW-9 Q A <br />MW-10 Q <br />TH-201 Q (.~ <br />TH-202 Q (Ivi) <br />TH-203 Q (M) <br />PAW-1 S (Q) S (Q) A <br />PAW-2 S (Q) S (Q) A <br />PAW-8 S (Q) S (Q) ~ A <br />PAW-9 S (Q) S (Q) A <br />RDA Pond ++ ++ A <br />NEW-2 Q (M) A (Nn A <br />NEW-3 Q (M) A (NI) A <br />NEW-4 Q (NI) A (M) A <br />NPDES S[a[ions: <br />NE OOIG (Remediation System Dischazge) ++ ++ <br />NE 004 (Pond) ++ ++ <br />NE 005 (Pond) ++ ++ <br />NE 007 (Pond) ++ ++ <br />NE 008 (Pond) ++ ++ <br />i~c 033 (Sewage Treatment} ++ ++ <br />hc080 (PRS-4'~ ++ ++ <br />Thickener Pump C M Q <br />Rzcvclin; Pump C <br />IiEY: C =Continuously <br />W =Weekly <br />M =Monthly <br />Q =Quarterly (Febnaary, May, August, November) <br />A =Annually (November for ail sites except interm ittent and ephemeral streams for which storm events <br />will be collected). <br />S = Semi-annual (Vlay, November) <br />*See Table 28 for parameters included in each suite. <br />++See NPDES Permit for frequency and paaameters. <br />~Moni[oring program during temporary cessaiton. As the Preparation Pl ant Facilities become active, the Division will <br />be notified in writing and frequency of monitoring wil l be increased as indicted in pazenthesis Q. <br /> T~ ~{3 5j~99 <br />Z.OS-90b (revised 03/10/99} <br />