Laserfiche WebLink
Mining Timetable <br /> <br /> <br />Task # <br /> <br />Descri tion Time <br />needed <br />eazs <br /> <br />I Stripping of topsoil and mining year I gravel, construct 2 topsoil <br />stock files and reclaim northern end of current it. <br />1 <br />2 Stri in of minor to soil and minin ear 2 vel. 1 <br />3 Stri in of minor to soil and minin ear 3 vel. 1 <br />4 Minin ear 4 ravel. 1 <br />5 Stri in of to soil and minin eaz 5 avel. 1 <br />6 Stri in of to soil and minin ear 6 avel. 1 <br />7 Stri in of to soil and minin ear 7 vel. 1 <br />8 Stri in of to soil and minin eaz 8 avel. 1 <br /> <br />9 Stripping of topsoil and mining yeaz 9 gravel and reclaim portion of <br />ear 8 area. <br />1 <br />10 Stri in of to soil and minin ear 10 vel. 1 <br /> <br />11 Stripping of topsoil and mining year 11 gravel, and reclaim year 10 <br />slo es which are mined 3H:1V <br />I <br /> <br />12 Stripping of topsoil and mining year 12 gravel, and reclaim year 11 <br />slo es which are mined 3H:1V. This is a ]ar a reclamation azea. <br />1 <br /> <br />13 Stripping of topsoil and mining year 13 gravel, and reclaim yeaz 12 <br />slo es which are mined 3H:1 V. <br />1 <br /> <br />14 Stripping of topsoil and mining year 14 gravel, and reclaim yeaz 13 <br />slo es which aze mined 3H:1 V. <br />1 <br /> <br />15 Mining year 15 gravel, and reclaim year 14 slopes which are mined <br />3H:IV <br />1 <br /> <br />16 Mining year 16 gravel, and reclaim yeaz 15 slopes which aze mined <br />3H:1V <br />1 <br />Total 16 <br />As described in the mining plan, all phases of the mine are planned by year; therefore the <br />duration of each phase is one year. The topsoil will be stripped from the mining phase each yeaz <br />immediately prior to the mining, if topsoil stripping is required for that year. <br />4. Equipment <br />The following equipment or comparable equipment is expected to be used during the mining of <br />the pit expansion area: <br />Vagneur Pit June 07 D-6 <br />