My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-07-09_REVISION - M1980085
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980085
>
2007-07-09_REVISION - M1980085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:33:20 PM
Creation date
11/21/2007 9:56:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980085
IBM Index Class Name
Revision
Doc Date
7/9/2007
Doc Name
Submittal
From
Greg Lewicki & Associates
To
DRMS
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mining Timetable <br /> <br /> <br />Task # <br /> <br />Descri tion Time <br />needed <br />eazs <br /> <br />I Stripping of topsoil and mining year I gravel, construct 2 topsoil <br />stock files and reclaim northern end of current it. <br />1 <br />2 Stri in of minor to soil and minin ear 2 vel. 1 <br />3 Stri in of minor to soil and minin ear 3 vel. 1 <br />4 Minin ear 4 ravel. 1 <br />5 Stri in of to soil and minin eaz 5 avel. 1 <br />6 Stri in of to soil and minin ear 6 avel. 1 <br />7 Stri in of to soil and minin ear 7 vel. 1 <br />8 Stri in of to soil and minin eaz 8 avel. 1 <br /> <br />9 Stripping of topsoil and mining yeaz 9 gravel and reclaim portion of <br />ear 8 area. <br />1 <br />10 Stri in of to soil and minin ear 10 vel. 1 <br /> <br />11 Stripping of topsoil and mining year 11 gravel, and reclaim year 10 <br />slo es which are mined 3H:1V <br />I <br /> <br />12 Stripping of topsoil and mining year 12 gravel, and reclaim year 11 <br />slo es which are mined 3H:1V. This is a ]ar a reclamation azea. <br />1 <br /> <br />13 Stripping of topsoil and mining year 13 gravel, and reclaim yeaz 12 <br />slo es which are mined 3H:1 V. <br />1 <br /> <br />14 Stripping of topsoil and mining year 14 gravel, and reclaim yeaz 13 <br />slo es which aze mined 3H:1 V. <br />1 <br /> <br />15 Mining year 15 gravel, and reclaim year 14 slopes which are mined <br />3H:IV <br />1 <br /> <br />16 Mining year 16 gravel, and reclaim yeaz 15 slopes which aze mined <br />3H:1V <br />1 <br />Total 16 <br />As described in the mining plan, all phases of the mine are planned by year; therefore the <br />duration of each phase is one year. The topsoil will be stripped from the mining phase each yeaz <br />immediately prior to the mining, if topsoil stripping is required for that year. <br />4. Equipment <br />The following equipment or comparable equipment is expected to be used during the mining of <br />the pit expansion area: <br />Vagneur Pit June 07 D-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.