the northern boundary between the operation the Braun residence. The second berm will be <br />located on the flat area on the top of the hill towazds the southeast end of the expansion area near <br />where the road which defines the eastern boundary of the expansion terminates. These two azeas <br />have been outlined as special areas of concern because of the proximity of houses in these two <br />areas. Both berms will be built to a height of ten feet with 3H:1 V slopes. The berms will be <br />immediately seeded with a temporary seed mix since they will be present for more than one yeaz. <br />These berms aze shown on Map C-2. The Braun berm will store 3400 cy and the southeast berm <br />will store 700 cy. The remainder of the topsoil will be placed on fully regraded flat areas or <br />slopes in the existing pit. <br />Exnansion Mining Details <br />Mining will progress in slices as shown on Map C-3, which shows the cross sections of the <br />mining plan. The entire hillside along the western edge of the expansion will initially be stripped <br />of topsoil and overburden. The dozer will then begin pushing from the crest of the hill towazds <br />the pit. No blasting is needed to move the in place material. Material will be pushed down the <br />initial steep slope until a uniform 3H:1 V slope is established. This slope will be the final <br />reclamation slope angle. The 3H:1 V slope will continue to be pushed back towards the ultimate <br />mining limits until they aze reached. The first portion of the final reclamation surface to be <br />exposed is the center of the mining area. This and all final slopes will be established as soon as <br />possible to provide timely reclamation. The northern half of the mining area will then be <br />completed. At this point, the primary direction of mining will be towazds the south. Again, as <br />the final reclamation surface is exposed, it will be prepazed for reclamation. <br />Subsequent stripping operations will be very limited in duration. Prior to the removal of a slice <br />of gravel, the topsoil and overburden will be removed from the top edge of the slope. Access for <br />stripping operations will be from the 3H:1 V mining slope or the existing access road which <br />borders the mining extents. The stripped material will either be immediately used for <br />reclamation elsewhere in the pit or be stockpiled. All stockpiles that are semi-permanent (I year <br />or more) will be seeded within 2 months of construction to prevent erosion. <br />Access to mining will be primarily on the active 3H:1 V slope and limited to heavy equipment <br />such as dozers only. Secondary access will be maintained to the top of the existing pit and the <br />l~agneur Pit June 07 D-4 <br />