stockpiling will take place on the existing pit bottom, which is 40-80 feet lower than the <br />surrounding terrain, thus maintaining the low visibility and noise of these existing activities <br />TopsoiUOverburden Handling <br />As of the start of 2007, all topsoil and overburden has been stripped from the mining azea on the <br />existing flat terrace. This area is approximately 47 acres. Subsoil in this area was thin and was <br />combined with the topsoil. The berm around the east and north sides of the existing pit contains <br />this topsoilsubsoil. The average height is 10 feet, with 2H:1 V sideslopes and 20' wide at the top. <br />The length of the pile is 4650 feet long. Therefore, the volume of the stockpile is approximately <br />68,000 cubic yards and utilizes approximately 6.4 acres. The mining azea which was stripped is <br />approximately 45.4 acres. <br />Topsoil was also stripped from the employee housing area and placed in a berm around the azea <br />itself. This area of 2.8 acres disturbance produced a volume of topsoiVsubsoil of approximately <br />7000 cubic yards. <br />Given a total stockpile volume of 68,000 cy + 7,000 cy = 75,000 cy, and a total strip area of 2.8 <br />acres + 45.4 acres = 48.2 acres, the average strip depth was 0.96 feet <br />In the expansion area, the natural slopes have only 6" to 1' of topsoil. The flatter top of the hill <br />has up to 14' of overburden below the 1' of topsoil, but this area is relatively small: <br />approximately 1.3 acres. The slope azea to be mined is approximately 14.7 acres. Based on these <br />figures, the amount of topsoil and overburden to be recovered in the expansion area is <br />Flat area overburden: 1.3 acres x 14' depth = 29,360 cy <br />Slope area and flat area topsoil: 16.0 acres x 1' depth = 25,813 cy <br />The overburden will be placed in the old areas of the pit, similaz to the imported material. This <br />material has historically been placed on the north side of the pit. <br />Prior to any mining taking place in the expansion azea, two topsoil berms will be created in order <br />to create a visual and audio screen in areas of special concern. The first berm will be built along <br />Vagneur Pit June 07 D-3 <br />