My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV08708
DRMS
>
Back File Migration
>
Revision
>
REV08708
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:09:16 AM
Creation date
11/21/2007 9:56:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Revision
Doc Date
3/27/2007
Doc Name
Request for Hearing
From
Jim Tatum
To
OSM, DRMS
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The March 21, 2007 proposed decision IS NOT CONSISTENT, with; 3Q <br />817.121. (c) (5). The March 2l, 2007 proposed decision DOES NQT'~REQUIRE B. <br />RESOURCES, INC. TO_INC1iEASE TI-i~_BOND as cited irithe "$tate Cs?urt;j:udgt <br />of $622,000.OO;.plus'pre and post judgment. interest from March 22;2002 to t}e;p~ <br />date ,at the rate of 8%~ attorneys"fees,: expert fees and t:uurt vuals.ul S% Di1 E <br />_.... _ <br />-.:. ,. _. <br />intentionally disregard the duective of the Federal govez~nzr~eAt~ <br />It has now been FIVE yeazs that Basin Resources, Inc. has been allowed to retnain " <br />under bonded and in violation of State and Federal permitting requirements, Ati .increase <br />of $622,000.00 does not provide us with the protection we are entitled to per S1vICRA. <br />Per Mr. Cxianni Amato with International Bank, Trinidad the following amounts <br />are due on the judgment as of today and as of AptY130, 2007; <br />$622,000.00 at 8°1o from 3!21/02 thro}hgh 3/27/07 = $255,505.00 TOTAL $877,SOS.00 <br />$412,787.32 (attorneys fees, costs, etc) at R% from 3/21/02 through 3/27/07 - <br />$141,778.00 TOTAL $554,565.32 <br />$1,034.787.32 at 8% froth 3/21/02 through 4/30!07 = TOTAL $1,458,142.32 <br />How do you propose to rectify this? Which entity will be responsible for the <br />under bonded amount, $ 1,458,142.32 less $622,000,00 = $836,142:32 plus an'addi6onal <br />approximate TWENTY SIX THOUSAND DOLLARS each month until the judgment is <br />satisfied? PerRutc 2.07,4(3) and Rule 3.02.2(4) (c) T am requested s hesrins. -. <br />The decision to increase the bond .n the amount of $622,000.00 "adversely <br />affects" me, our property, and is totally contrary to 30 CF]t 817.121 (c) (5). I am <br />also requesting that Jim Fulton he present at the hearing, to testify as to the Federal <br />rules, OSM's understnnding of DRI MS February 15, 2007 letter, and the failure of <br />DRIVIS to follow the law. <br />A prompt response.is requested. <br />Very truly yours, +~--~-~ <br />C.L <br />Ann Tatum <br />AT/ah ` <br />Cc: Cheryl Linden, AGO Facsimile (343) 866-5691 <br /> <br />E0 3~Jtld Wflltll WIC 65L09b86SL LT~EL 0002/GZlEO <br />
The URL can be used to link to this page
Your browser does not support the video tag.