Laserfiche WebLink
<br />III IIIIIIIIIIIII III <br />999 <br />,,'.OAHP:.Use:Only:. OAHP Doc. Na. OAHP <br />Project No. <br />.::..Date Received: Reviewed By: .' <br />COLORADO OFFICE OF ARCHAEOLOGY AND HISTORIC PRESERVATION <br />Limited-Results Cultural Resource Survey Form <br />21 Mazch 1995 DRAFT <br />(page 1 of 6) <br />Small scale limited results projects include block surveys under 50 acres and lineaz surveys under two miles. To be <br />included under these guidelines there should be no sites and a maximum of two Isolated Finds. <br />See manual for instructions. This form must be typed. <br />I. IDENTIFICATION <br />1. Report Title (include County): Mountain Coal Company's West Elk Mine 1996 Exploration Program <br />Five Exploratory Drill Holes and Alternate and 4.5 Miles of Proposed Temporary Access Corridors. <br />Gunnison National Fores. Gunnison County. Colorado. <br />2. Survey Organization/Agency: Metcalf Archaeoloeical Consultants. Inc. <br />Principal Investigator: Carl Spath. Ph.D. <br />Other Crew: none <br />Address: P.O. Box 899. Eaele. CO 81631 <br />3. Date of Field Work: 10/12/95 <br />4. Lead Agency:. US Forest Service. Collbran Raneer District <br />Contact: Sally Crum <br />Address: Collbran Raneer District. Box 338. Collbran. CO 81624 <br />5. Client: Mountain Coal Company <br />6. Permit Type and Number: USFS_ReQion 2 Special Use Record #890138 expires 12/31/96 <br />7. Report/Contract Number: Date: 10/16/95 <br />8. Form Completed By: Cazl Spath. Ph.D. <br />9. Comments: <br />II. PROJECT DESCRIPTION <br />10. Type of Project: Class III inventory of exploratory core holes and temporary access corridors <br />11. Size of Project (acres): ca. 59.4 acres (5.4 block: 54 tineazl <br />12. Nature of Anticipated Disturbance: 5 drill pads, and one alternate. each ca. 100' x 100' for exploratory <br />cores. and approximately 4.5 miles of corridor for temporary access roads that will be closed and <br />reclaimed after completion of core holes: drill pad will be leveled and cleared of veeetation for rie and <br />support equipment. access roads will be cleared and cut ca. 5' wide <br />13. Comments: at the request of the Forest Service, most of the access corridors have been placed on steep <br />to very steep side slopes to avoid drainaees and maintain less than 8% erade <br />