Laserfiche WebLink
SYNOPSIS OF EVENTS III IIIIIIIIIIIIIIII <br />Cash Mine and Mill, Permit No. M-83-141 <br />Boulder County, Colorado <br />Co-operators: Gold Hill Ventures Ltd. Partnership and Colina Oro Molino, Inc. <br />(representatives) (Mark A. Steen) (Wayne Tatman, <br />Gwen Fraser) <br />9/7/83 110(2) permit issued to Gold Hill Mining Company (GHMC) to <br />reactivate the Cash Au-Ag Mine and complete surface mine dump <br />sorting and upgrading. Total acreage - 2.261 ac. <br />6/30/85 Amendment filed by GHMC to increase acreage to 7.638 ac with <br />addition of a number of mine dumps (Who Do, White Cloud, Wynona) <br />and a gravity and flotation concentration mill. <br />p.l states It (the mill) will be used exclusively to process ore <br />from Gold Hill Ventures' properties. The Mill will not accept or <br />process third party or custom ore on a toll mining or contract <br />basis." <br />p.8 outlined water pumping and storage scheme from Left Hand Creek <br />to bulkheaded Time Mine adit to Wynona Shaft or drilled well to <br />mill. Hazel A adit bulkhead to be used for overflow storage.' <br />9/13/85 Division inspection revealed mill construction occurring without a <br />permit. <br />9/23/85 Mr. Steen letter response to adequacy concerns - said 10 mil <br />hypalon liner will be installed in tailings impoundment. Gold <br />Hill residents concerned about seepage of water in impoundment into <br />ground water. <br />9/25/85 Amendment approved. <br />9/26/85 Board issues NOV for Mining without permit, Cease and Desist, and <br />civil penalty of $2,800. <br />10/2185 Civil penalty paid, C & D lifted. <br />10/2/85 SO approved from Gold Hill Mining Company to Gold Hill Ventures <br />Limited Partnership (GHVLP). <br />10/25/85 MLRD inspection - no problems <br />11/11/85 MLRD compliance inspection on tailings liner, Hazel A bulkhead. <br />