My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV08694
DRMS
>
Back File Migration
>
Revision
>
REV08694
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:09:15 AM
Creation date
11/21/2007 9:55:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981053
IBM Index Class Name
Revision
Doc Date
1/16/1990
Doc Name
Midterm Review Findings Document
From
MLRD
To
BLUE FLAME COAL CO
Type & Sequence
MT1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />_" COLORADO MINEI~AND R ECLAMATION DIVISION <br />- HYDR <br />R AU <br />IC EXCAVATOR <br />• <br />M <br />ESTIMATING FO WORK <br />L <br />Jo. 2 Prep. By: DTM Permit No, C-81-U53 <br />12/27/89 Filename: C053-2 Operation blue flame <br />t Action Midterm Review <br />Description Upper Bench Backfi lling <br />Y EBUIPMENT COST: <br />Labor Single, Doubl e, or Triple <br />~ty: LA PLATA Zone 1 Shifts S <br />ine Descript. CAT 2256 (track mounted) <br />Breakdown: Utilization Equipment <br />""--`"""'~~' adJustment: Filename: <br />Ownership cost/hr = $34.25 N/A 2256--EX <br />Operating 8 Overhaul Cost/Hr = $29.26 {100%) '~~'" ~~~• <br />Operator cost/hr = $20.26 N/H Total Fleet <br /> --------- Cost/Hr: <br />Total Eqpt, Unit Cost/Hr = $83.77 $83,77 <br />RIAL 9UANTITIES: <br />Mme: 824 CCY <br />tial '~~•~''' '"~ ~'' Swell Loose <br />ume: 824.0 CCY Factor: 1.165 Volume: 960.0 LCY <br />rce of quantity take-off: Division site msmts <br />rce of est. swell factor: Cat Handb ook <br />LY PRODUCTION: <br />le Time - Basic cycle time vs fob condition rating AVE RAGE <br />"`~'"""• - Selected time value wi thin basic rating MINIMUM <br /> Basic cycle time = 0.320 min. <br />~ket Capacity _.._... _....__.._..__,.... <br />Rated Capacity: 1.250 LCY (nom inal heaped) <br />ucket Fill Factor: 0.975 Loose mat erial - mixed moist aggregates {95-100%) <br />Adjusted Capacity: 1.219 LCY <br />b Condition Correction Factors - Altitude Adj_ = 1.000 <br />_"_.~.,._~~_~___..,...._.....,._......._._..........__.......... - Job Efficiency = 0,830 (lsh/d) <br />Site Altitude = 7,500 ft. -------- <br />"'~~•~`"'"~ Net Correction 0.830 <br />Unadjusted Hourly Unit Production 228.52 LCY/Hr <br />Adjusted Hourly Unit Production 189.67 LCY/Hr <br />Adjusted Hourly Fleet Production 189.67 LCY/Hr <br />3 COST: <br />Fleet size 1 Unit(sl Total Job Time: 5.06 Hours <br />Unit Cost 50.442 /LCY Total Job Cost: $423.96 <br />
The URL can be used to link to this page
Your browser does not support the video tag.