My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV08694
DRMS
>
Back File Migration
>
Revision
>
REV08694
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:09:15 AM
Creation date
11/21/2007 9:55:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981053
IBM Index Class Name
Revision
Doc Date
1/16/1990
Doc Name
Midterm Review Findings Document
From
MLRD
To
BLUE FLAME COAL CO
Type & Sequence
MT1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' COLORAD~INED LAND RECLAMATION DIV~ON <br />ESTIMATING FORM - BULLDOZER WORK <br />TASK N0. 1 PREP. BY: DTM PERMIT N0. C-81-053 <br />DATE 12/27/89 FILENAME: C053-1 OPERATION: Blue Flame <br />PERMIT ACTION Midterm Review <br />TASK DESCRIPTION Backfill Upper Bench <br />HOURLY EQUIPMENT COST: Single, Dou ble, <br />Labor or Triple <br />County: LA PLATA Zone 1 Shifts S <br />Machine Descript. CAT DSL with universal blade & 3-shank ripper <br />Cost Breakdown: Utilization Equipment <br />"" "`""""" "' adjustment: Filename: <br />Ownership cost/hr = $49.37 N/A D8L-U3RP <br />Operating & overhaul cost/hr- Dozer = $45.57 (100%) " " " "` <br />-Ripper = 50.49 (10%) <br />Operator cost/hr = $20.08 N/A Total Fleet <br /> --------- Cost/Hr: <br />Total Eqpt. Unit Cost/Hr = $115.52 5115.52 <br />MATERIAL QUANTITIES: <br />Beg. <br />Volume: 4428 LCY <br />Initial """""""" "`"' Swell Loose <br />Volume: 4,428.0 LCY Factor: N/A Volume: 4,428.0 LCY <br />Source of quantity take-off: Division Site Msmts <br />Source of est. swell factor: NA <br />HOURLY PRODUCTION: <br />Avg. push distance: 100.00 ft. <br />Unadjusted hourly <br />dozer production: 1091.55 LCY/hr <br />Material consistency: <br />Compacted fill or embankment <br />Avg. push gradient: +15.00 % <br />Job Condition Correction Factors <br />Operator.......... 0.75 (avg.) <br />Mat. consistency.. 0.90 <br />Dozing method..... 1.00 (gen.) <br />Visibilit}•........ 1.00 (avg.) <br />Job efficiency.... 0.83 (lsh/d) <br />Transmission type. 1.00 Ips) <br />Grade adjustment.. 0.77 <br />Altitude adj. .... 1.00 <br />Material xeight... 0.79 <br />Avg, site altitude: 7500.00 ft. Blade type........ 1.00 (S or U) <br />Material xeight 2900.00 lb/LCY Net Job Correction 0.34 <br />Mat. Descr.: """""""` """""`""" <br />Decomposed rock - 50% Rock, 50% Earth Adjusted Unit Prod.: 374.95 LCY/hr <br />Adjusted Fleet Production: 374.95 LCY/hr <br />JOB COST: <br />Fleet size 1 Dozers) <br />Uni t. Cost 50.308 /i,CY <br />Total Job Time: 11.81 Hours <br />Total .Tnh Cnst.t 41.384.27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.