My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV08600
DRMS
>
Back File Migration
>
Revision
>
REV08600
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:09:11 AM
Creation date
11/21/2007 9:55:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
9/22/1999
Doc Name
POWDERHORN COAL CO REVISION ORDER OSM/DMG INSPECTION APPLICATION FOR A TR PERMIT C-81-041
From
JE STOVER & ASSOCIATES
To
DMG
Type & Sequence
TR31
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PCO~ <br />~ ~~$ <br />®., COLORADO DIVISION OF bini TERALS Ai~1D GEOLOGY <br />•~• 1313 Sherma~ Room 2t5, Denver, Colorado 80203, (303) 866-3567 <br />,. ~ <br />APPLICATION FORM FOR A REVISION <br />TO A COAL MINING AND RECLAMATION PERMIT <br />This form must be completed and submitted with all requests for minor revisions, as defined in Rule 1.04(731. <br />technical revisions, as defined in Rule 1.04(7361, and permit revisions, as defined in Rule 1.04(90). All <br />revisions are to address the requirements of Rule 2.08.4. Three (3) copies of the revision, including maps, <br />must be submitted in order for it to be complete. <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised sections, maps, <br />tables and/or figures, with a revised table of contents, if necessary. The revision submittal date should be <br />printed in the lower right corner of each revision page. A cover letter to the revision should explain the nature <br />of the revision and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing <br />list (except OSM) at the same time the application is submitted to the Division, and proof of distribution must <br />be submitted to the Division along with the application. Copies of revision pages modified during the review <br />process must be distributed in the same manner, along with proof of distribution. Proof of distribution must <br />be submitted prior to implementation of the revision. <br />Permit No.: C - al - 041 Date: _~~ / 22 / 99 <br />Permittee: Powderhorn Coal Company <br />Street: P__. Q Hox 14 3 0 <br />City: Palisade <br />State: ~~ Zip Code: a1526 - <br />Brief Description of Revision: Revise disturbed area boundary and <br />Public Notice Attached: Yes 7D( No _ (Required for PR's and TR's) <br />Bond Increase: Yes _ No ~( Federal _ Non-Federal XX Mine <br />Proposed Change in: <br />Disturbed Area (+) _ _ l,g Acres Affected Area (+) _ _ l.g Acres <br />PertnkArea (+) _ Z 4,Q Acres Federal Land (+/-) _ _ Q,II Acres <br />State Land (+/-) _ _ Q,Q Acres Private Land (+) _ 2 g,Q Acres <br />
The URL can be used to link to this page
Your browser does not support the video tag.