Laserfiche WebLink
Stipulation No. 26 <br />THE APPLICANT'S QUARTERLY MONITORING REPORTS SHALL CONTINUE TO INCLUDE <br />QUALITY AND QUANTITY MONITORING OF ALL DISCHARGES FROM THE MINE SITE. <br />WATER QUALITY MONITORING SHALL CONSIST OF 7HE EFFLUENT LIMITATIONS PLUS <br />TOTAL DISSOLVED SOLIDS. <br />Previously terminated. <br />Stipulation No. 27 <br />This stipulation number was never used. No Stipulation 27 exists. <br />Stipulation No. 28 <br />WEST ELK COAL COMPANY OR ANY SUCCEEDING OPERATOR OF THE MT. GUNNISON <br />NUMBER 1 MINE, MUST CONTINUE TO SUBMIT 70 THE DIVISION, AN ANNUAL <br />HYDROLOGIC REPORT. THIS REPORT SHALL INCLUDE AN ANALYSIS OF ALL <br />HYDROLOGIC DATA GATHERED DURING THE YEAR, AN ASSESSMENT OF 7HE IMPACTS OF <br />MINING DURING THE YEAR, AND AN ESTIMATE OF THE PROJECT IMPACTS OF MINING <br />IN THE FOLLDWING YEARS. THIS REPORT SHALL ASSESS THE IMPACTS OF MINING <br />ON THE QUALITY AND QUANTITY OF WATER IN SURFACE STREAMS, SPRINGS, GROUND <br />WATER AQUIFERS, MINE INFLOW AND MINE DISCHARGE. <br />This stipulation has been incorporated into the permit application on pages <br />4-68, 4-70, and 4-71. It is therefore terminated as of October 27, 1989. <br />New Status: Terminated. <br />Stipulation No. 29 <br />WITHIN NINETY (90) DAYS OF APPROVAL OF THE LOWER WASTE PILE PERMIT <br />REVISION, WECC SHALL SUBMIT A REVISED WATER MONITORING PLAN THAT INCLUDES <br />MONITORING OF THE WASTE PILE. THE PLAN SHALL INCLUDE DIRECT SAMPLING OF <br />THE SEDIMENT POND AND UNDERDRAINS DISCHARGE TWICE PER YEAR DURING THE <br />SECOND AND THIRD QUARTER OF THE YEAR. THE PARAMETERS SHALL BE THE FULL <br />LIST OF CHEMICAL CONSTITUENTS, AT LEAST FOR THE THE FIRST YEAR. WECC MAY <br />REQUEST AN ADJUSTMENT OF THE MONITORING REQUIREMENTS AFTER THE FIRST YEAR <br />DEPENDING ON THE RESULTS OF THE MONITORING. <br />Previously complied with. <br />Stipulation No. 30 <br />WECC MUST SUBMIT ADDITIONAL BOND, IN THE AMOUNTS DESCRIBED IN THE LOWER <br />WASTE PILE PERM I7 REVISION APPLICATION, AT LEAST THIRTY (30) DAYS PRIOR <br />TO THE COMMENCEMENT OF CONSTRUCTION OF PHASES III, IV, AND Y OF THE LOWER <br />WASTE PILE. THESE ADDITIONAL BONDS MUST BE APPROVED AND ACCEPTED BY THE <br />DIVISION PRIOR TO CONSTRUCTION FOR THESE PHASES. <br />The narrative in the bonding <br />the Lower Waste Pile (Volume <br />permit. The stipulation is <br />1986. <br />New Status: Terminated. <br />section of the permit application which addresses <br />12) incorporated this stipulation into the <br />therefore considered terminated as of January 17, <br />-9- <br />