Laserfiche WebLink
~- <br />Page 4 <br />next permit term will primarily ba in the B-seam, the subsidence monitoring network is shown <br />with the B-seam mine plan. <br />2. Site S end N were originally proposed to provide additional information loom within end above <br />the E-seam. Willa are atilt proposed to be completed in these horizons (see Table S, page 2.04 <br />65), but will not be at the S and N silos previously proposed, becauw site N could not bs <br />completed a8 a monitoring well, end site S may not be drilled. The fltture monitoring well sites <br />will depend on the sites approved and the conditions encountered in the future exploration <br />program. The planned exploration program (and any future monitoring sites) is on U.S. Forest <br />Service lend end the program has been and will be strictly limited. The Environmental <br />Assessmertt for the 1996 program is will being drafted by the U.S. Forost Service, and, at least <br />preliminarily, does not appear favorable toward estebtishing monitoring sites. <br />Please call a9 soon as possible to further discuss these responses end to suggest a date by which <br />the final decision can be made. <br />Sincerely, <br />ll,,>> • <br />~l/r~l~ <br />Katlilcen G. Welt, , ~ <br />Etrvironmental Supervisor <br />w; Christine Johnston, MCC <br />Phil Schmidt, MCC <br />