My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV08550
DRMS
>
Back File Migration
>
Revision
>
REV08550
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:09:08 AM
Creation date
11/21/2007 9:54:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
1/20/1996
Doc Name
FAX COVER WEST ELK MINE
From
MOUNTAIN COAL CO
To
DMG
Type & Sequence
PR6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ ~ ~ <br />Page 3 <br />X29 be added to the 1~ (not in reviled Exhibit 27). Please sae thin reference at the top of page <br />2.04-127, <br />Ooeret(on Plan (2.05.21 <br />„4. See page 60 in new Volume 13 for tho barrier pillar discussions. <br />x,10. WWE's response to this question was added to revised pages 2.OS-141 and 142, 2.05.135 <br />and l 56, and 2.05-198. Copies of these pages are attached with these discussions highlighted. <br />MItlQStion of Surface Coal Minln¢ Operations Impacts <br />D. Protection of Hvdrologj~ Balance <br />~: Hardness will be added to Table 7 for ~IYtli baseline monitoring. Please be aware that <br />hardness has not bean analyzed for any past baseline, <br />E. Probable H~ d~olo 'cot Conse~,tencea <br />~. Yes, Exhibit 19A wntaina all baseline data obtained to date tom tho ~yy, proposed <br />monitoring resources. Data from other tssourcea in the current, approved monitoring program <br />ere provided in the Annual Hydrology Reports. <br />/13. MCC does not understand why the Table SS must be labeled es being "baseline". This tabls, <br />ae well u others in the permit text, provides data that aro discussed in the text. Table SS is <br />referenced in discussions on page 2,OS-171. Based on these diacussion4 it is apparont that the <br />table contains pro-mining data, as the quality of B-seam water to be encountered is projected to <br />be of similar, treatable quality as that onwunterod in these wills. <br />17. Figure 14 is outdated and is no longer referenced in the permit text, so is no longer included <br />in Volume 1, but was proposed to be moved to new Volumo 13. Instead, MCC will update Map <br />5 to show more current Beat Mine worlonge, along with the Oliver Mine workings, in complisnu <br />with Rule 2,10,3(1)(k). <br />X22. The discussions on mining method were ~ deleted from the revised text as stated is the <br />W WE response. No operations discussions were deleted. Please ace the discusaiopa in the <br />operations description beginning on page 2.05-8. <br />Miscellaneous Exhibits end Maps <br />/ 12. The legond on Map 30 is accurate, as the wrrer-t B-seam mine plan is dopictad. The 8-seam <br />mina plan id shown (end can be easily referenced) on Map S 1 and shows that the mitring in the & <br />seam is not planned until the end of the next permit form (2001). As mining in the current and <br />
The URL can be used to link to this page
Your browser does not support the video tag.