My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-07-09_REVISION - M1977493
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2004-07-09_REVISION - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:27:11 PM
Creation date
11/21/2007 9:54:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
Revision
Doc Date
7/9/2004
Doc Name
SPCC/MCP
From
Climax Molybdenum Company
To
DMG
Type & Sequence
TR7
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 4. Retulatorv Cross-Referencin¢ in Climax Mine SPCC/MCP <br />If the SPCC plan does not follow the exact outlined sequence of § 112.7, then the operator <br />must supply "section cross-referencing the location of requirements listed in this part and <br />the equivalent requirements in the other [custom] prevention plan." The purpose of the <br />following table is to provide the required cross-referencing. <br />REGULATORY REGULATORY REQUIREMENT DISCUSSION SPCC SECTION <br />CITATION NUMBER S <br />112.7 a 3 A written descri tion of all facilities 5 <br /> <br />§ 112.7(a)(3)(i) An oil inventory depicting quantities of product and used oils <br />Table I & App. 4, 6, 7 <br /> in story a containers <br />§ 112.7(ax3)(ii) and Dischazge prevention and control measwes 5 <br />iii <br /> <br />§112.5(a)(3)(iv) Countermeaswes for discharge discovery, response, and clean- <br />5 <br /> u , includin how an outside contractor can hel with clean-u <br />§ ] 12.7 a (3 v Methods of dis osal for contaminated soils, ra s, booms, etc. 5 <br />§ 112.7(a)(5)(b) A written discussion and map depicting the direction of flow Figwes 1 and 2; section 5 <br /> in the event of a s ill <br /> Provisions for and discussion of containment and or <br />§ ] 12.7(a)(5)(c) diversionary structures or equipment to prevent discharges 5 <br /> (dikes, berms, retaining walls, cwbing, culverts, gutters, weirs, <br /> booms, retention onds, etc. <br />112.7 d 1 Oils ill contin enc lan 11 <br /> A plan for tank and piping integrity testing and inspection <br />§ 112.7(d) and (e) protocols. Must be prepared by a licensed professional Appendix 3 <br />and § 112.8(c)(6) engineer. Records of integrity testing must be maintained with <br /> the SPCC ]an. <br /> Secondary containments must be designed (or verified) and <br />§ 112.7(h) provided for all storage containers to hold the volume of the 5 <br /> tank + an allowance for reci itation <br /> Complete discussion of conformance with applicable <br /> <br />§112.7) requirements and other effective discharge prevention and <br />5 <br /> containment procedwes listed in any applicable more stringent <br /> State rules, re lations, and uidelines <br />
The URL can be used to link to this page
Your browser does not support the video tag.