Laserfiche WebLink
• <br />• <br />• <br /> <br /> Table of Con1 <br />Section Description <br /> <br /> <br />10.0 Engineering Evaluation <br />10.1 Purpose of the Engineering Evaluation <br />10.2 Regulatory Background on Deviations and Clarif <br />10.3 Specific Deviations and Rationale for the Climax <br />10.4 Overall Evaluation of Spill Potential at Climax Iv <br />11.0 Oil Contingency Plan <br />11.1 Introduction and Background <br />11.2 Responsible Climax Employees -Spill Response <br />11.3 Emergency Spill Response Procedures <br />11.4 Reporting and Notification Procedures <br />12.0 References <br /> <br />List of Tables <br /> Table 1. Table of Chemicals Used at Climax Mine (page 13) <br /> Table 2. PCB Table (page 43) <br /> Table 3. Spill Control Equipment List (pages 83, 84, 85) <br /> Table 4. Regulatory Cross-Referencing Table for Climax Mine SPCC Plan (Inside Front Cover) <br /> <br /> Appendices <br /> Appendix 1. Spill /Release Information Sheet, RQ's, and PD's Release Reporting Procedures __ <br /> Appendix 2. Visual Tank Inspection Standard Operating Procedures <br /> Appendix 3. Climax Mine Tank Integity Testing Plan _~ <br /> Appendix 4. Climax Mine Tank Inventory for SPCC Revision of May 2004 <br /> Appendix 5. Previous Tank Integrity Tests from 2000 <br />- <br />r- <br /> Appendix 6. Electrical Transformer Oil Storage I _i <br /> Appendix 7. Climax Mine Mobile Equipment Oil Inventory _ <br /> Appendix 8. Stormwater Release Form <br /> <br /> List of Fib res <br /> Figure 1. Climax Mine Site Map <br /> Figure 2. Climax Mill Building Complex ~ <br /> i <br /> _ <br /> ~ <br /> <br /> <br /> <br /> - <br /> ~ <br /> <br /> <br /> <br /> <br /> -- ' ---- <br /> <br />---1 I <br />- <br /> Revision of May 2004 <br />