Laserfiche WebLink
Rule 2.05.6. Mitigation of the Impacts of the Loadout Operation <br />24. Page 2.05-25 states that surface water monitoring will be done at SAES 1, 2, 3 and <br />4. Page 3 of Exhibit 9 explains that the monitoring will consist of the acquisition of <br />two samples. If compliance with water quality standards is confirmed by these rivo <br />samples, then no further sampling would be required, unless requested by the <br />Division. Has this sampling been done and, if so, please point out the location of <br />the sampling results. <br />The Division has no further concerns at this time. Terror Creek will sample the <br />runoff from SAE's 1, 2, 3 and 4 after a significant storm event. <br />25. Please update page 2.05-26 to include the dugout pond in the reclamation plan. <br />The Division has no further concerns. Terror Creek revised page 2.05-26. <br />If you have any questions, please call me. <br />Sincerely, <br />~-1 <br />seph J. D ash <br />Environmental Protection Specialist <br />cc: Larry Routten (DMG) <br />c:1wp61 \terror\rn3 adeg2 <br />