Laserfiche WebLink
ASSEMBLY <br />INSTRUCTIONS <br />1) Unroll the unit over fhe place of <br />installation. •^~+ow <br />,o.,~E w~ <br />~, ~,~,.. <br />2) Lift the ends, the sides and the <br />dividers into position and join the <br />connecting points with wire ties. <br />3) Tie the diaphragms to the sides <br />and the dividers as per sketch. <br />E <br />R <br />i <br />1) Cover the entire area to be protected by tying the required units together. <br />2) Fill the various sections with 8 cm to 14 cm stone starting from the bottom. <br />3) The filling operation cart be carried out with any type of machinery but the voids should be kept to a <br />minimum and the exposed face should be smoothed. <br />4) After the tilling has been completed the lids will be unrolled in place and tied to the sides, edges, <br />dividers and diaphragms. <br />LO 'd 555 'ON Xd.~ <br />j I1::5I NOW 66-LZ-d3S <br />INSTALLATION <br />