Laserfiche WebLink
San Luis Project ~ • Specifications <br />E.2 SITE PREPARATION <br />E.2.1 Clearing and Grubbing <br />Clearing of vegetation and grubbing of roots shall be conducted in areas designated for <br />construction by [he Field Engineer. Stripping shalt not extend beyond 10 feet from the edge of <br />channel to be constructed, unless as shown on the llrawings or as approved by the Field <br />Engineer. <br />Cleazed vegetation and roots shall be disposed of as directed by the field engineer. <br />E.2.2 Preparation of Subgrade Surface <br />The surface of aeeas that have been cleared and grubbed shall be graded to the general <br />configuration shown on the brawings. Materials larger than a 12-inches in size and other <br />deleterious materials as determined by the Field Engineer shall be removed. Materials that <br />protrude more than 3 inch above the regraded surface, as determined by the Field Engineer, shall <br />be removed. <br />The graded surface shall be compacted with a minimum of three passes with a wlpacker-packer or <br />approved equivalent compacting equipment. Water addition may be required during material <br />placement for dust control or ease of placement. <br />Battle Mountain Ree~ources, /ne. Draft .1'hepherd Milfer. Inc. <br />~~ganiR4.dri+s~10036TeuW~~.E~paa:.Sss E - 4 September 1999 <br />L l 'd 555 'ON Xdd <br />~ Ic~cl unit aa_i~_,-,~ <br />