Laserfiche WebLink
San Luis Project • • Sprcifuationt <br />assistants) will be independent representatives of BMRl, appointed by BMRI. The inspection <br />and QA testing conducted by the Field Engineer shall be under the supervision of a Professional <br />Engineer registered in the State of Colorado. <br />Inspection and QA testing shall include the tasks listed below. <br />• Observation of construction practices and procedures for conformance with the <br />Specification, <br />• Testing material characteristics to ensure that earthen materials used in the <br />construction conform to the requirements in the Specifications. <br />• Testing liner material characteristics and installation to ensttrc placement, <br />compaction, deployment, seaming, and other work practices conform to the <br />requirements in the Specifications. <br />• Documentation (on a daily basis) of construction activities, test locations, samples, <br />and test results. <br />• Notification of results from quality assurance testing to the Contractor. <br />• Documentation of field design modifications or approved construction work that <br />deviates from the Specifications. <br />Documentation outlined above shall be recorded by the Field Engineer on a daily basis. <br />Deviations from the Specifications shall be discussed with BMRI and the PmfeSsional Engineer <br />and must be approved by the Professional Engineer with notification to DMG or other <br />appropriate Colorado state regulatory agency personnel. <br />E.1.6 Construction Documentation <br />During construction, documentation of construction inspection work will be recorded by the <br />Field Engineer on a daily basis. Documentation will be done on a daily 5eld engineer report <br />form that includes the following items. <br />• Work perforated by the Contractor. <br />• QA testing and surveying work conducted. <br />• Discussions with BMRI and the Contractor. <br />• Key decisions, important communications, or design modifications. <br />• General comments including, weather conditions, soil or liner surface conditions, <br />visitors to the site, etc. <br />All earthwork and synthetic liner QA test results will be documented on a daily basis (on <br />separate reporting forms), with a copy of the results given to the Pield Engineer by the end of the <br />following working day after the testing. <br />Bartle Mounm~k Resources. Inc Draft ShepherC ~Ni!ler. Inc. <br />~~g~wihbari~e~i00:6Testtdi~cpypoeQ doe E - 2 September 1999 <br />5I 'd 555 'ON Xdd <br />i 9£:5I NOW ss-17.-,I~G <br />