Laserfiche WebLink
<br />Globe Hill/Ironclad <br />Reclamation Cost <br />Area: N.E. Victor Mill Vat Leach Tails Production Rates CostNnit Voles & Areas <br /> CY/Hr. Acres/Hr. S/Acre CY Acres <br /> Fertilize: - 1.5 162.1] - 5.5 <br /> Rip: - 1.0 132.81 _ 5.5 <br /> Hauling Topsoil: <br /> Scraper 122 - - 4450 - <br /> Spread on Slope: 763 - - 4450 - <br /> Soil Analysis: - 4.0 # 80.00 - 5.5 <br /> Seeding: Flat - 2.8 336.56 - 1.0 <br /> Slope - 1.0 302.86 - 4.5 <br /> Draging: Flat - 3.8 34.88 - 1.0 <br /> Slope - 2.5 52.00 - 4.5 <br /> Hydromulching - 0.6 551.23 - 5.5 <br /> Trees & Shrubs; - 0.5 156.74 - 5.5 <br /> Prod. Labor Equip. Material Hourly Total <br /> Equip. <br />------------ Number Units <br />------------------ Rate Hours <br />------ <br />--- Cost <br />-- Cost Cost Cost Cost <br /> <br />Fence R®oval: • <br />Backhoe 48HP <br />1.0 2866 - <br />------ <br />- -- <br />- ------- <br />0.94 ---------- <br />0.38 --------- <br />0.00 --------- <br />1.32 -------- <br />3783 <br />Fertilize: DSN 1.0 5.52 1.5 4 21.14 117.66 104.36 243.16 973 <br />Rip: D9N 1.0 5.52 1.0 6 21.14 111.67 0.00 132.81 797 <br />Haul Topsoil: 623E 3.0 4450 366 12 20.28 122.28 0.00 142.56 5132 <br /> D9N 1.0 - - 12 21.14 111.67 0.00 132.81 1594 <br /> 14G Grader 1.0 - - 6 20.42 63.12 0.00 83.54 501 <br /> Water Trk. 1.0 - - 6 17.59 95.18 0.00 112.77 677 <br />Spread on Slope: D9N 1.0 4450 763 6 21.14 111.67 0.00 132.81 797 <br />Soil Analysis: - - 5.5 4.0 - 0.00 0.00 20.00 20.00 440 <br />Seeding: Flat D8N w/hopper 1.0 1.00 2.8 1 21.14 117.66 803.57 942.37 942 <br />Slope Hand 3.0 4.52 3.0 2 15.87 0.00 286.99 302.86 1817 <br />Draging: Flat DSN w/harrow 1.0 1.00 3.8 1 21.14 111.41 0.00 132.55 133 <br />Slope D8N w/chain 1.0 4.52 2.5 2 21.14 108.86 0.00 130.00 260 <br />Hydromulch: Hydramulcher 1.0 5.52 0.6 9 49.57 31.83 249.34 330.74 2977 <br />Trees do Shrubs: - 3.0 5.52 1.5 4 15.87 0.00 166.00 181.87 2182 <br />For®an Pickup <br />- <br />--- 1.0 - <br />-- <br />---- - <br />- 43 26.86 8.42 0.00 35.28 1517 <br /> -------- ------ <br />------ -- <br />---------- ----- --------- ------------------- <br />Total Cost --------- -------- <br />24521 <br />r Cost/linear foot, R.S. Mea ns, Site Work do Landscape Cost Data, 1994, pg.23. <br /># saraplesjacre <br /> <br />