Laserfiche WebLink
<br />Globe Hill/Ironclad <br />Reclamation Cost <br />Area: No. Victor Mill Vat Leach Tails <br />Recontouring: <br />Fertilize: <br />Rip: <br />Haul Topsoil: <br />Spread on Slope: <br />Soil Analysis: <br />Seeding: Flat <br />Slope <br />Draging: Flat <br />Slope <br />Hydromulch: <br />Trees do Shrubs: <br />Foreman <br /> <br />~J <br />Production Rates CostNnit Volumes do Areas <br /> CY/Hr. Acres/Hr. S/Acre CY Acres <br /> Recontouring: 677 - - 2000 - <br /> Fertilize: - 1.5 162.11 - 7.9 <br /> Rip: - 1.0 132.81 _ 7.9 <br /> Hauling Topsoil: <br /> Scraper 154 - - 6400 - <br /> Spread on Slope: 763 - - 5600 - <br /> Soil Analysis: - 4.0 80.00 - 7.9 <br /> Seeding: Flat - 2.8 336.56 - 1.0 <br /> Slope - 1.0 302.86 - 6.9 <br /> Draging: Flat - 3.8 34.88 - 1.0 <br /> Slope - 2.5 52.00 - 6.9 <br /> Hydromulching - 0.6 551.23 - 7.9 <br /> Trees & Shrubs: - 0.5 156.74 - 7.9 <br /> Prod. Labor Equip. Material Hourly Total <br />Equip. Number Units Rate Hours Cost Cost Cost Cost Cost <br />D9N 1.0 2000 677 3 21.14 111.67 0.00 132.81 398 <br />D8N 1.0 7.93 1.5 5 21.14 117.66 104.36 243.16 1216 <br />D9N 1.0 7.93 1.0 8 21.14 11].67 0.00 132.81 1062 <br />623E 3.0 6400 462 14 20.28 122.28 0.00 142.56 5988 <br />D9N 1.0 - - 14 21.14 111.67 0.00 132.81 1859 <br />14G Grader 1.0 - - 7 20.42 63.12 0.00 83.54 585 <br />Water Trk. 1.0 - - 7 17.59 95.18 0.00 112.77 789 <br />D9N 1.0 5600 763 T 21.14 111.67 0.00 132.81 930 <br /> - 7.9 4 - 0.00 0.00 20.00 20.00 632 <br />D8N w/hopper 1.0 1.00 2.8 1 21.14 117.66 803.57 942.37 942 <br />Hand 3.0 6.90 3.0 2 15.87 0.00 286.99 302.86 1817 <br />D8N w/harrow 1.0 1.00 3.8 1 21.14 111.41 0.00 132.55 133 <br />D8N w/chain 1.0 6.90 2.5 3 21.14 108.86 0.00 130.00 390 <br />Hydromulcher 1.0 7.90 0.6 13 49.57 31.83 249.34 330.74 4300 <br />- 3.0 T.90 4.0 2 15.87 0.00 166.00 181.87 1091 <br />Pickup 1.0 - - 57 26.86 8.42 0.00 35.28 2011 <br />x See detailed Haulage Sheet <br />q sales/acre <br />Total Cost 24143 <br />~. <br />ou <br />