Laserfiche WebLink
14 <br />i <br />RINSE 2: <br /> <br /> No. oP Pore Volumes 1 <br />'i Volume of Make-up Water 3693600 gallons <br /> Days per Segment 20 <br /> LABOR COST (3 operators/shift: 3 shifts/day) <br /> Operator <br />------ <br />--- <br />- <br />-- S/hr. Hours Cost <br /> - <br />- <br />--- <br />------- <br />9 ----------- --------- <br />15.87 ---------- <br />4320 -------- <br />617026 <br /> E$UIPMEAIT COST <br /> S/hr. !/hr. <br /> Equip. <br />---------- <br />--- <br />- Ownership Oper. Hours Cost <br /> - <br />- <br />-------- ----------- <br />3.47 --------- <br />3.12 --------- <br />4320 --------- <br />28469 <br /> Bac Pump 3.47 0.00 4320 14990 <br /> Generator 2.54 0.00 4320 10973 <br /> Power 0.00 2.40 4320 10368 <br /> Total 64800 <br /> MATERIAL COST <br /> <br />------------- <br />-- Gallons !/gal. Cost <br /> -- <br />------- <br />Cost of Water ----------- --------- <br />3693600 ---------- <br />0.0031 -------- <br />11450 <br /> Sprinkler System 5700 • <br /> Total 17150 <br />~ TOTAL COST RINSE 2 698976 <br /> <br /> <br />