Laserfiche WebLink
13 <br />Globe Hill/Ironclad <br />Reclamation Cost <br />Area: I-Y Heap Leach Detoxification <br /> Input <br />Rate <br />Application Rate 750 gpm <br />0.0043 gpm/sq.ft. <br />Volume Treated 4224270 tons <br />No. of Se~oents 9 <br /> Output <br />Retention Volume 81041151 gallons <br />Pore Volume 194338378 gallons <br />i Segment Area 174419 sq.ft. <br />Make-up Rate 15 gpm <br />Gallons per Day 1080000 gpd <br />Pore Vol. per Segment 21593153 gallons <br />RINSE 1: <br />No. of Pore Volumes 1 <br />Volume of Make-up Water 3693600 gallons <br />Denys per Se~ent 20 days <br />LABOR (3 operators/day 3 shifts/day) <br />Operator <br />------------------ <br />---- <br />- Sjhr. <br />-------------------- Hours <br />-------- Cost <br />--------- <br />- <br />- <br />9 15.87 4320 617026 <br />FJgl1IPMENT COST <br /> S/hr. S/hr. <br />i ~ <br />-------- Equip_--------- Ownership Oyer. <br />------------------ Hours <br />-------- Cost <br />--------- <br />P~~ 3.47 3.12 4320 28469 <br />Backup Pump 3.47 0.00 4320 14990 <br />Generator 2.54 0.00 4320 10973 <br />Power 0.00 2.40 4320 10368 <br /> Total 64800 <br />MATERIAL COST <br /> Gallons S/gal. Cost <br />------------------------ <br />Cost of Water --------------------- <br />3693600 -------- <br />0.0031 --------- <br />11450 <br />Sprinkler Syst® 11410 • <br /> Total 22860 <br /> TOTAL COST RINSE 1 704686 <br /> 'L~DTAL DAYS 180 <br />• From Means Site Work be Landscape Cost Data,1994, pg. 95 <br />• <br />