Laserfiche WebLink
11 <br />Globe Hill/Ironclad <br />Reclamation Cost <br />Area: Victor Plant Site <br />Demolition & Disposal <br /> s <br />Building Length Width Peak Eave Cu.Ft. S/Cu.Ft. Cost <br />FS~gineering 40 25.0 11.0 9.0 10000 0.18 1800 <br />Change Roan 30 27.0 12.0 8.0 8100 0.18 1458 <br />Security 10 10.0 10.0 9.0 950 0.18 171 <br />Laboratory 83 32.0 12.0 8.0 26560 0.18 4781 <br />Maintenance <br />Light Vehicle Shop 80 56.0 13.0 12.0 56000 0.16 8960 <br />Truck Wash Facility 75 45.0 44.0 40.5 142594 0.16 22815 <br />Mill <br />Vats #1-4 and Process 175 200.0 30.0 20.0 875000 0.16 140000 <br />Vats #5-8 and Process 276 130.0 26.0 20.0 825240 0.16 132038 <br />Maint. Warehouse 57 200.0 46.5 265050 0.16 42408 <br />Agglomerator 20 76.0 34.0 25840 0.16 4134 <br />Sump/pump 16 15.0 13.0 1560 0.16 250 <br />i Conveyor Shed 85 13.0 21.0 11603 0.16 1856 <br />Process Corridor 15 175.0 24.0 31500 0.16 5040 <br />Office Area 40 70.0 16.0 13.0 40600 0.17 6902 <br />i <br />St® Walls <br />Height <br />Sq.Ft. <br />Maintenance/Warehouse 220 6.0 1320 7.27 9596 <br />Conveyor Recess 63 12 756 7.27 5496 <br />Tanks No.Tanks Diameter Radius Height Cu.Ft. <br />Process Area 9 22 11 18 61550 0.16 9848 <br />Retaining Wall <br />Steel Column & Wood Wa ll See Appendix 2500 <br />Total Demolition 400054 <br />x R.S. Means <br /> <br />