Laserfiche WebLink
• • <br />Cresson Project <br />Reclamation Cost <br />Area: Haul Road Reclamation Production Rates Cost/Unit Volumes do Areas <br /> -------- <br />CY/Hr. -------- <br />Acres/Hr. --------- <br />!/Acre ------- <br />CY -------- <br />Acres <br /> Recontouring: 270 - - 49100 - <br /> Fertilize: - 1.5 162.11 - 23.7 <br /> Rip: - 1.0 132.81 23.7 <br /> Hauling Topsoil: 250 - - 1'F900 - <br /> Spread Topsoil: 763 - - 5800 - <br /> Soil Analysis: - 4.0 / 80.00 - 23.7 <br /> Seeding: Flat - 2.8 336.56 - 13.0 <br /> Slope - 1.0 302.86 - 10.7 <br /> Draging: Flat - 3.8 34.88 - 23.7 <br /> Hydromulching: - 0.6 551.23 - 23.7 <br /> Trees do Shrubs: - 0.5 156.74 - 23.7 <br /> Prod. Labor Fquip. Material Hourly Total <br /> Equip. Number Units Rate Hours Cost Cost Cost Cost Cost <br />Recontouring: 2458 2.0 49100 540 91 21.53 151.34 0.00 172.87 31462 <br />Fertilize: D8N 1.0 23.7 1.5 16 21.14 117.66 104.36 243.16 3891 <br />Rip: DION 1.0 23.7 1.0 24 21.14 148.62 0.00 169.76 4074 <br />Haul Topsoil: 623E 1.0 12900 250 52 20.28 122.28 0.00 142.56 7413 <br /> D9N 1.0 - - 52 21.14 111.67 0.00 132.81 6906 <br /> 14G Grader 1.0 - - 26 20.42 63.12 0.00 83.54 2172 <br /> Water Trk. 1.0 - - 26 17.59 95.18 0.00 112.77 2932 <br />Spread on Slope: D9N 1.0 5800 763 8 21.14 111.67 0.00 132.81 1062 <br />Soil Analysis: - - 23.7 4.0 - 0.00 0.00 20.00 20.00 1896 <br />Seeding: Fl et DSN w/hopper 1.0 13.0 2.8 5 21.14 117.66 803.57 942.37 4712 <br />Slope Hand 3.0 10.7 3.0 4 15.87 0.00 286.99 302.86 3634 <br />Draging: Flat D8N w/harrow 1.0 23.7 3.8 6 21.14 111.41 0.00 132.55 795 <br />Hydramulch: Hydromulcher 1.0 23.7 0.6 40 49.57 31.83 249.34 330.74 13230 <br />Trees & Shrubs: - 3.0 23.7 1.5 16 15.87 0.00 166.00 181.87 8730 <br />Foremen Pickup 1.0 - - 246 26.86 8.42 0.00 35.28 8679 <br />Total Cost 101589 <br />'t- samplesJacre <br />r <br />O <br />