My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV08334
DRMS
>
Back File Migration
>
Revision
>
REV08334
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:08:58 AM
Creation date
11/21/2007 9:52:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
5/25/2004
Doc Name
Submittal (PART 2)
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
TR43
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.+ Then: is no chance to the following facilities or elements approved for the Cresson <br />Project undec Amendment No. 8: <br />^ Permit Boundary <br />^ Affected Acreage <br />^ Post Mining land Use <br />^ Overall Reclamation Plan <br />• Mine areas (other than to the proposed extension to the East Cresson Mine) <br />^ Primary haul roads <br />• Overburden Storage Areas <br />^ Explosives facilities <br />^ Maintenance facilities <br />Mining equipment <br />^ Employment <br />^ Crushing facilities <br />^ VLF <br />^ Processing facilities <br />^ Laboratory <br />• Overall mine drainage plan and storm water management plan <br />• Mine access roads <br />^ Air Quality Monitoring <br />• Surface Water Quality Monitoring <br />The fo]lowing project elements are modified for the Cresson Project with approval of <br />TR 43 for the ECME: <br />• The approved East Cresson Mine will be extended to the south in the area <br />identified as the East Cresson Mine Extension. <br />^ Two new ground water wells have been installed neaz the Permit Boundary. <br />Approximately 5.5 million tons of additional gold ore and 23.5 million tons of <br />overburden aze contained within the proposed ECME. This ore and overburden will be <br />mined using the existing equipment fleet and within the Amendment No. 8 levels of <br />projected employment. <br />The ore will be crushed and processed using the existing crushing and conveying <br />facilities. Ore will be processed on the existing VLF and recovered in the existing process <br />facility. An estimated 120,1)00 recoverable ounces of gold are expected from the ECME. <br />Approximately 23.5 million tons of overburden (non-economic rock) will be removed <br />during mining of the ECME. This rock will be backfilled into other portions of the East <br />Cresson Mine, along with rock from other mining azeas already approved under <br />Amendment No. 8, to establish apost-mining topography as approved under the <br />• Amendment No. 8 reclamation plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.