Laserfiche WebLink
I!1. fomments - Compliance <br />Below are comments on the inspection. The comments includr. dizcussiun of <br />o~~servations mane during tyre inspection. Conments also descriue any <br />enforcement actions taken during the inspection and the facts or evidence <br />supporting the enforcement action. <br />pond had recently been discharged. <br />MB-2: At the time of the inspection, water from MB-6 was being <br />pumped into MB-2. Flocculent was being added at the <br />inlet to MB-2. The other inlet to MB-2 was flowing. <br />Flocculent was also being added and settling immediately <br />upon entering the pond. <br />MB-3: At the time of the inspection MB-3 held a small amount of <br />water. <br />MB-4: The operator is considering installing an oil skimmer in <br />MB-4. In addition, a gated principal spillway is being <br />considered. A revision would be required to install <br />either of the items. Hay bales located across the <br />emergency spillway should be removed, or designs should <br />be provided. <br />MB-5: Water level was over the gated opening, but the pond was <br />not discharging. <br />MB-6: The pond had begun to be cleaned prior to the rainstorm. <br />Material pushed out of the pond should be removed and <br />transported to the refuse pile. This task began prior to <br />the conclusion of the inspection. Water was being pumped <br />to MB-2 in attempt to further dry out the pond so <br />cleaning could continue. <br />4 <br />