Laserfiche WebLink
IV. Enforcement Actions <br />The following identifies enforcement actions taken during this inspection. the <br />required abatement and date of abatement for the violation, previous violations <br />still requiring abatement and the termination of violations cited during previous <br />inspections. <br />Notice of Violation C-93-023 was issued for failure to pass disturbed <br />area drainage through a sedimentation pond or treatment facility. The <br />violation applies to the Trout Creek water pump. Abatement requires <br />submittal of a technical revision to address runoff treatment, by April <br />20, 1993. The plan must be implemented within 15 days of revision <br />approval, but no later than July 04, 1993. <br />Notice of Violation C-93-024 was issued for failure to ensure that <br />construction and maintenance of access roads controls or prevents <br />erosion and siltation. The notice applies to the Goat Trail access <br />road. Abatement requires submittal of a technical revision to address <br />road drainage, by April 20, 1993. The plan must be implemented within <br />15 days of revision approval, but no later than July 04, 1993. <br />Notice of Violation C-93-025 was issued for failure to include <br />descriptions and designs for all existing structures for which a design <br />is required. The notice applies to the Moffat pond inlet, two culverts <br />and all road ditches on the Goat Trail, berms at the explosives <br />magazine and shop, the culvert at the shop fuel pumps, and the ditch at <br />the outlet of culvert E12. Abatement requires submittal of a technical <br />revision, which includes designs for these structures, by April 20, <br />1993. The plan must be implemented within 15 days of revision <br />approval, but no later than July 04, 1993. <br />Notice of Violation C-93-026 was issued for failure to protect topsoil <br />and vegetation, and to retain sediment within disturbed areas. The <br />notice applies to the northwest area of the grizzly pad, the conveyor <br />belt system and transfer points, and the east side of the shop area. <br />Abatement of the violation requires removing coal from undisturbed <br />areas and repair of berms within 15 days of this notice, submittal of <br />a technical revision by April 20, 1993, and construction of sediment <br />control devices within 15 days of approval but no later than July 04, <br />1993. <br />Notice of Violation C-93-027 was issued for failure to construct and <br />7 <br />NOTE: Attach appropriate VIOLATIONS OR CESSATION ORDER CODING FORMS <br />Revised: 4/88 <br />Doc. No. 8101E <br />