Laserfiche WebLink
energy fuels coal, inc. <br />eoulblielo mine • poet o81te box Il9 • florence, coloreoo 8/228 • (71B) 7846395 <br />iii iuiiiiiiiiii iii <br />999 <br />i ,_ <br />January 20, 199Zf,~•• ',~_ <br />k.~•; <br />Ms. Cathy Begej ~AN24 lgg; <br />Mined Land Reclamation Division ij„jn~ <br />1313 Sherman St. Room 215 `~,,~- c~ana <br />Denver, CO 80203 ~^ "•" ~'.•„ <br />RE: Information on Rapid Compliance, Notice of Violation Nos.: <br />C-91-29 <br />C-91-30 <br />C-91-32 <br />C-91-33 <br />/C-91-35 <br />Southfield Mine, Your File No. C-81-014 <br />Dear Ms. Begej: <br />This letter is written to provide information concerning <br />rapid compliance of conditions cited in the above referenced <br />notices of violation by Energy Fuels Coal, Inc. (EFCI) as provided <br />by Rule 5.04.3(1). As you know, the above five violations along <br />with three additional violations were issued by the Division on <br />January 2, 1992 as a result of a complete inspection on December <br />17-19, 1991. Due to circumstances surrounding the holiday season, <br />all eight violations were received by EFCI via certified mail on <br />January 6, 1992. <br />Efforts to abate some of the cited conditions began <br />immediately following the December inspection with information <br />provided by you concerning pending violations at that time. This <br />work proceeded even though the mine was in complete holiday shut <br />down status from December 21, 1991 through January 1, 1992. With <br />the return of all mine personnel on January 2nd, efforts were <br />accelerated to complete abatement steps in a timely manor. <br />, The work completed by EFCI to abate certain steps of the <br />referenced violations achieved rapid compliance with respect to <br />the available working days at Southfield. Specific items <br />completed and the time of completion are summarized below with <br />respect to NOV number. <br />NOV C-91-29; Abatement Step 1: <br />All necessary ditch and culvert work was completed at the <br />loadout, excluding the east side perimeter ditch, on January 2nd <br />and 3rd. At the mine, the refuse pile collection ditch and access <br />road ditch were recut to designed size by January 2nd. In <br />