Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : OMG <br />Task 0 : 001 Slate :Colorado Pennigjoh tl : M-1980-171 <br />Date : 77272000 County : Oumy Ahbrevialion :none <br />User: WHE Sile:Bachelor-Khedive M/ne Filename:M/71-001 <br />Permit ar other job action : TR-01 review <br />task deacription : Slope reduction from 1H:1V to 3H:1V with excavator <br />HOURLY EQUIPMENT COST <br />Basic machine :Car 320 (1996) Shifl basis : 1 per day <br />Cost Breakdown : Utiliz alipn % Horsepower : 128 <br />Ovmership cosghour : 52].25 NA <br />Operating cosghour : $25.73 100 Weight (MT) : 19.12 <br />Operator cosUhour: 323.13 NA <br /> Cast data source : (CRGJ <br />Total unit cosVhour : E72.71 Total Oeel cosUhour : $72.11 <br />Initial Swell <br />volume: 802 LCY factor: <br />Source of quantity takeolf :See attached c <br />Source of estimated swell factor : NA <br /> <br />Cvele Time Basic digging condition description : AVERAGE <br />Time value within basic digging condition : AVERAGE <br />Cycle time : 0.32 min. <br />Bucket CaoaciN <br />Rated capacity: 1.57 LCY (heaped) Size class: large <br />Bucket gll lector: 0.88 Blasted rock-well blasted (80-95%) <br /> <br />Adjusted capacity: 1.37 LCY <br />Joh Contlilion Correction Factors Altitude adjustment : 0.85 (Cat HB) <br /> Job effieienry adjustment : 0.83 (1 shiNday) <br />Site altitude : 8,500 feet <br /> Net job conection : 0.71 <br />Unadjusted hourly unit production : 255.98 LCY/Hr <br />Adjusted hourly unit production : 180.59 LCY/Hr <br />Adjusted hourly Meet production : 180.$9 LCY/Hr <br /> <br />JOB TIME AND COST - r <br />Fleet size : / Excavator(s) Total job lime : .j,¢4 Hours <br />Unit cost : 50.399 /LCY Total joh cast : $320 <br />Loose <br />NA volume : 802 LCY <br />. 'Slope Reduction' <br />