My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE20695
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE20695
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:31:07 PM
Creation date
11/21/2007 9:49:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980171
IBM Index Class Name
Enforcement
Doc Date
11/24/2000
Doc Name
COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~` • • <br />CIRCES Cost Estimatino Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date: 21-Nov-2000 <br />Permit or job no.: M-1980-171 <br />III IIIIIIIIIIIIIIII <br />999 <br />Q~~~i~ fi/t~,, <br />v16 .. ~Cd <br />Site : Bacf$?Ol~ <br />State :Colorado <br />County : Ouray <br />User : WHE Abbreviation : none <br />Filename: M171-000 <br />Agency or organization name : DMG <br />Permit or job action : TR-Ol review <br />TASK LIST (DIRECT COSTSI FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br /> <br />001 -Slope reduction from 1 H:1 V to 3H.' 1 V with excavator excavate 1 4.44 $320 <br /> <br />002 -Slope reduction from 1H.'1V to 3H:1V with dozer dozer 1 11.7 $1,402 <br /> <br />003 -Place nprap along toe o/ final slope excavate 1 0.29 $21 <br /> <br />004 -Finish grade for drainage control dozer 1 3.1 $385 <br /> <br />005 -Backfill portal and install drain pipe mineseal 1 4.0 $722 <br /> <br />006 -Revegetate 2 acres affected area revege 1 4.0 $1,751 <br /> <br />007 -Haul reclamation equipment to and fromjo6 site mobilize 4 2.8 $872 <br /> <br />008 -Remove mist debris, assume 10'L •5'W 'S'H @ $0.27Jcf NA 1 4.0 $55 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />sueTOrALS: 34.4 $5,528 <br />includes inllalion factor adjustment of <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - <br />NA <br />Liability insurance <br />Performance bond <br />Job superintendent <br />Profit <br />1.55 <br />1.05 <br />NA• <br />10.00 <br />TOTAL DIRECT COST = $5,528 <br />o(direct total = $86 <br />of direct total = $58 <br />NA NA total = NA <br />of direct total = $553 <br />'not squired (or eqp, operator serves as super) TOTAL O 8 P = $697 <br /> CONTRACT PMOUNT (direcl + O 8 P) _ $6, 225 <br />PROJECT MANAGEMENT - <br />Engineering work and/or contracUbid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $311 <br />CONTINGENCY- NA• NA total= NA <br />'confingencres accounted /Drat task level TOTAL INDIRECT COST= $1,008 <br /> TOTAL BOND AMOUNT (direcl+ indirect) _ $6,536 <br />
The URL can be used to link to this page
Your browser does not support the video tag.