Laserfiche WebLink
<br />PAGE 3 <br />JANUARY 13, 1994 <br />BARBARA PAVLIK <br />The refuse pile shall be compacted to attain 90% of maximum dry density. 'tests shall be performed <br />on the waste bank to ensure the minimum level of compaction is reache:i. These tests shall be <br />made in areas which represent the area being compacted. No test will be performed during periods <br />of rain, snow melt or when the pile is unreasonably wet. Tests shall be performed on a minimum <br />of a monthly basis during the active compaction process of the refuse pile: consVuction. <br />If the proposed plan is acceptable to DMG, please let us know and WFU will proceed accordingly. <br />Sincerely, <br />~ ~ " <br />Murari P. Shrestha, F'.E. <br />Assistant Manager of Engineering <br />MS:Igp <br />ce: Raja Upadhyay <br />Mike Weigand <br />Jeff Dubert <br />Tim Chervick <br />