My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-04-02_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-04-02_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:49 PM
Creation date
11/21/2007 9:47:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
4/2/2003
Doc Name
Weekly Const. Report
From
CC&V
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_` =Golder <br />1~SSOClc'1teS <br />March 11, 2003 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303) 980-0450 <br />(303) 985-2080 <br />Golder Project No.: 003-2203 <br />FiECElVED <br />2755 State Highway 67 <br />Victor, CO 80860 APR Q 2 2~~3 <br />w1Y151611 ~f Minerals and Geology <br />RE: Summary No. ll: February 16 through March 8, 2003 <br />Cresson Project Phase IVb, c Construction Quality Assurance <br />Dear Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase IVb and c Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of February 16 <br />through March 8, 2003. <br />The weather during this reporting period was clear to cloudy. Approxirnate daytime low <br />temperatures ranged from 2° F to 27° F, and highs ranged from 19° F to 47° F. Snow was recorded <br />on Febri~y 180i, 190`, 240' through 280', and Mazch lst. Weather observations were made on eight <br />days of this twenty-one day reporting period. <br />Construction Synopsis <br />Ames Construction Ina (Ames) of Aurora, Colorado is the earthworks contractor for the Phase PJb and <br />c construction. Ames conducted Phase IVb and c construction activities on eight days of this twenty- <br />one day reporting period (February 17 through 20 and February 25 through 28). <br />Phase IV b <br />Ames did not perform construction related activities within the Phase IVb area during this reporting <br />period. <br />Phase IV c <br />Ames continued cut excavation and temporary stockpiling of Structural Fill (SF) in the Phase IVc azea <br />above the Phase PJb/c temporary diversion channel. Ames placed SF downslope to the temporary <br />stockpiles, above and below the old Connolly haul road elevation. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.