Laserfiche WebLink
< EXHIBIT E <br />DUF. TO THE LIDIITED DEPTH OF TOP SOIL MATERIAL TO-BE REDIOVED AND STOCKPILED'; <br />IT IS ESTIMATED THAT THE TOPSOIL MATERIAL DILL BE APPROXIMATELY 3,000 <br />YARDS IN STORAGE. THAT AMOUNT t9ILL YIELD RBOUT 3" OF TOP SOIL MATERIAL <br />EVENLY DISTRIBUTED ACROSS THE SITE. MORE TOPSOIL i9ILL BE HAULED IN IF <br />NECESSARY. <br />THERE SHOULD BE NO SIDE SLOPESf4HEN MINIA'G IS FINISHED AS THE PIT AREA <br />IS A HILL THAT I9ILL BE b1INED DOIdN TO THE BOUNDRY LEVELS. TOPSOIL <br />REPLACED SHOULD BE 6" IN DEPTH DSEANING 3" ADDITIONAL TOP SOIL DSAY B'c <br />NEEDED FOR THE PROPER DEPTH. UPON FINAL GRADING AND MINING THE ENTIRE AREA <br />I~~ILL BE CHISELED ^10 A DEPTH Or 6" TO 8" BEFORE TOPSOIL IS EVENLY REDIS- <br />TRIBUTED AND COFIPACTED TO PROVIDE A FIRM SEED BED. FERTILIZERS t4ZLL BE <br />ADDED IF NEEDED JUST PRIOR TO SEEDING. SEEDING i4ILL BE DONE IN EARLY SPRZY<G <br />OR L:,TE FALL .SEED ;SIXTURE AND RATES OF SEEDING SAIL L BE FOLLOIdED <br />FOR RECLAI^1ATION OF THE SITE AS OUTLINED IN THE SCS LETTER ENCLOSED. <br />SEEDI\G I~~ILL 5 DONF. IdITH A GRASS DRILJ~. ;t'U`4s$y1~T!~iF~~'0N I•;::?~I,L,~z3'^s~G'O:~'~, <br />UN`P:bL 'R6•^rA~' PE~?dT.T,^F.fl aBE$ Z~ C4?}PZ..H'$SJ DUE _•0. TR:~~F•F~i~~ E.i9 AI~IiD OUT ~OF <br />~~. P,gr, RECLAIMATION WILL BE DONE ACCORDING TO SOIL CONSERVATION RECONAIENDATIONS. <br />i~0 PO:1DS , ROP-,DS OR BUILDIIcGS IJZLL BE O~] SZ^i F. FOLLOI•]ING R~CLAIMATION. <br />THERE I•IILL BE ?:O I•?AST ROCK DUi9'rSLEFT ON THE SITE. <br />