Laserfiche WebLink
i <br />in place (Except the straw bales cited in another <br />violation) we feel that the plan has been <br />implemented. By definition however this abatement <br />will have to wait until approval by the CDMG of <br />revision Lhat wiii be submitted soon. <br />NOV C-93-025: The technical revision required by the first <br />abatement step has not yet been submitted. <br />Step 2 requires approval of the step 1 Technical <br />Revision. <br />NOV C-93-026: Step 1, removal of the material around the grizzly <br />pad, was completed on 5/5/93. Removal of material <br />adjacent to the shop was completed on 4/30/93. The <br />coal beneath the conveyor has not been removed. <br />Step 2 has not been completed. One problem we have <br />with this step is how to remove any of the material <br />without disturbing topsoil and vegetation. <br />Step 3 was completed on 5/5/93. <br />Step 4 has not been completed. <br />Step 5 cannot be completed until the revision far <br />step 4 has been approved. <br />Step 6, added 4/20/93, was completed on 5/7/93. <br />NOV C-93-027 Step 1 should not be required because the berm the <br />violation was written for is not the berm <br />referenced on the map. This step should be removed <br />as a requirement. <br />Step 2 has not been completed. <br />Step 3 was completed on 5/7/93. <br />As further abatement steps are completed we will attempt to notify <br />you by phone and follow this notification in writing. <br />Sincerely, <br />David Beverlin <br />Resident Engineer <br />